Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
A/M Of L/S Work Of 1) Pwd New Rest House At Fatehabad In Fatehabad Distt., 2) Pwd Rest House At Fatehabad In Fatehabad Distt., For The Year 2023 24 (Supply Of Material)
|
Description |
A/M Of L/S Work Of 1) Pwd New Rest House At Fatehabad In Fatehabad Distt., 2) Pwd Rest House At Fatehabad In Fatehabad Distt., For The Year 2023 24 (Supply Of Material)
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_294947_1 |
Reference Number |
EE/HORT/PWD/Gurugram |
Tender Fee | 500 |
EMD | 4500 |
Tender Value | |
Place | Gurugram |
Link | https://etenders.hry.nic.in |
Start Date | July 04, 2023 22:30 |
End Date |
01/08/2023 ( Expired 700 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreSubstation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
765/400/220 kv ais extension package - substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
Read moreSubstation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).
765/400/220 kv ais extension package - substation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet and road furniture safety measures with 5 year maintenance mc batala, fatehgarh churian and dera baba nanak group no-1
Read moreSupply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta- phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513
Supply and erection of tower material (members/pieces including fasteners etc.) for strengthening work of 765 kv (delta config.) suspension type towers of 765 kv s/c anta - phagi lines (ckt.- i and ii) on turnkey basis against bn-9018002513
Read moreTggenco-cetd-div-i- supply of course material to the assistant engineers (elect, mechl telecom) for conducting induction training programme at cetd during the year 2025-26
Tggenco-cetd-div-i- supply of course material to the assistant engineers (elect, mechl and telecom) for conducting induction training programme at cetd during the year 2025-26
Read moreSpecial repair of various link roads under special repair program 2022-23 2023-24 and 2024-25 including 5 year routine maintenance in mc patran district patiala group 2
Special repair of various link roads under special repair program 2022-23 2023-24 and 2024-25 including 5 year routine maintenance in mc patran district patiala group 2
Read moreof your Industry type