Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const. Of Dam With Sand And Bamboo And Const. Of Canal To Divert The Flow River Water For Protection Of Naoherua Village Under Sopd Fund For The Year 2025 26.
|
| Description |
Dprd/Btc/(Sopd)udl 14/2025/08
|
| Organisation | Bodoland Territorial Council | State Govt. and UT |
| Tender Id | 2025_BoTC_45108_1 |
|
Reference Number |
DPRD/BTC/(SOPD)Udl-14/2025/08 |
| Tender Fee | 500 |
| EMD | 50000 |
| Tender Value | - |
| Place | Mazbat Udalguri |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=71452 |
| Start Date | June 23, 2025 22:30 |
| End Date |
Expired
10/07/2025
Expired 462 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Diversion of river flow and protection of tower no. 58 of 132 kv sidcul-roorkee line associated with 220 kv sub-station, sidcul, haridwar
Diversion of river flow and protection of tower no. 58 of 132 kv sidcul-roorkee line associated with 220 kv sub-station, sidcul, haridwar
Read moreFdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Fdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Read moreContretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Read moreTemporary protection by digging cunnettee to divert the flow of river chakki from r/s to l/s for the protection of ashram and village abadies of saili kullian pathankot.
Temporary protection by digging cunnettee to divert the flow of river chakki from r/s to l/s for the protection of ashram and village abadies of saili kullian pathankot.
Read moreTemporary protection by digging cunnettee to divert the flow of river chakki from r/s to l/s for the protection of ashram and village abadies of saili kullian pathankot.
Temporary protection by digging cunnettee to divert the flow of river chakki from r/s to l/s for the protection of ashram and village abadies of saili kullian pathankot.
Read moreConstruction of canal from sarjamhatu river near check dam
Construction of canal from sarjamhatu river near check dam
Read moreConstruction of a channel to divert main flow of the saryu (ghaghra) river for protection of village-manjha rampur puwari situated on right bank of saryu(ghaghra) river in tehsil-sadar, district -ayodhya
Construction of a channel to divert main flow of the saryu (ghaghra) river for protection of village-manjha rampur puwari situated on right bank of saryu(ghaghra) river in tehsil-sadar, district -ayodhya
Read moreEmergent protection of village surjyakata and di of river gangia under sopd, btc
Emergent protection of village surjyakata and di of river gangia under sopd, btc
Read moreProtection wall of pmc canal between ch. 85 of parbati dam
Protection wall of pmc canal between ch. 85 of parbati dam
Read moreImprovement of branch canal no. 01 of longa flow irrigation scheme under sopd(g) for the year 2023-2024
Improvement of branch canal no. 01 of longa flow irrigation scheme under sopd(g) for the year 2023-2024
Read moreof your Industry type