Tender Details
Particulars | Details |
---|---|
Title |
Rectification Works By Providing Protective Treatment In Hot Water Condenser Pipes Of East And West At El 2.00 Mtr To 4.50 Mtr Level
|
Description |
Rectification Works&Amp#X0d
By Providing Protective Treatment In Hot Water Condenser Pipes Of East And West At El 2.00 Mtr To 4.50 Mtr Level
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1600 |
Tender Value | |
Place | TTPS |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 23:30 |
End Date |
23/06/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreCa no.cwe bly/ge (e)/10 of 2025- 2026special repair to bldg no p-338 in b charge, jcos mess (bldg no p-301 and guest room) unit run canteen (bldg no p-27c,p-27e and hs) at rts and depot hempur under ge (east) bareilly
Ca no.cwe bly/ge (e)/10 of 2025- 2026special repair to bldg no p-338 in b charge, jcos mess (bldg no p-301 and guest room) unit run canteen (bldg no p-27c,p-27e and hs) at rts and depot hempur under ge (east) bareilly
Read moreCa no.cwe blyge e 09 of 20252026spl repair to bldg no p-151, p-152, p-344 incl water through in a charge and bldg no p-337 water through in b charge at rts and depot hempur under ge (east) bareilly
Ca no.cwe blyge e 09 of 20252026spl repair to bldg no p-151, p-152, p-344 incl water through in a charge and bldg no p-337 water through in b charge at rts and depot hempur under ge (east) bareilly
Read moreCa no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Ca no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreProviding, laying, cutting, jointing and testing of 200mm od, 250mm od and 315 mm od upvc pipe sewer in ravi dass nagar and all other works contingent thereto at malout distt sri muktsar sahib
Providing, laying, cutting, jointing and testing of 200mm od, 250mm od and 315 mm od upvc pipe sewer in ravi dass nagar and all other works contingent thereto at malout distt sri muktsar sahib
Read moreof your Industry type