Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Of Ipb Street From Kharad Shop To Miglani Fabric Near Bhawana Chowk, Ward No. 4 Under Mc Panipat (Rural)
|
Description |
Providing And Laying Of Ipb Street From Kharad Shop To Miglani Fabric Near Bhawana Chowk, Ward No. 4 Under Mc Panipat (Rural)
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_302664_1 |
Reference Number |
202393F56361 5393 4DDD A1C9 336FEAD385A5286ULB |
Tender Fee | 1000 |
EMD | 7000 |
Tender Value | |
Place | Municipal Corporation Panipat |
Link | https://etenders.hry.nic.in |
Start Date | August 09, 2023 23:30 |
End Date |
17/08/2023 ( Expired 661 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreSpecial repair to bldg no. t-61 (supply pm) provn of repair shed with hardstanding near bldg no. p-04 and provn of drainage at nlp mil stn under ge 872 ews
Special repair to bldg no. t-61 (supply pm) provn of repair shed with hardstanding near bldg no. p-04 and provn of drainage at nlp mil stn under ge 872 ews
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreLaying ht and lt and 200 kva transformer installation at ward no.32 indira chowk to chulha gate
Laying ht and lt and 200 kva transformer installation at ward no.32 indira chowk to chulha gate
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreof your Industry type