Tender Details
Particulars | Details |
---|---|
Title |
Comprehensive Servicing And Maintenance Of 04 Nos Lifts Installed At Various Bmc Premises For Period Of 36 Months From 01 04 2025 To 31 03 2028
|
Description |
Comprehensive Servicing And Maintenance Of 04 Nos Lifts Installed At Various Bmc Premises For Period Of 36 Months From 01 04 2025 To 31 03 2028
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id | 2025_MCGM_1156303_1 |
Reference Number |
Dy Ch Engr M and E 3863 City date 03 03 2025 |
Tender Fee | 4394 |
EMD | 18300 |
Tender Value | |
Place | Municipal Workshop |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2013960 |
Start Date | March 08, 2025 16:30 |
End Date |
17/03/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreCalibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years
Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years
Read moreDeployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreCleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreT-670/mpphscl/emergency recovery trolley /qc/2025 dated 02-06-2025
Online tender for the quantity contract of emergency recovery trolley to be supplied and installed at various hospitals of government of madhya pradesh
Read moreof your Industry type