Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Servies For Feasibility Study And Dpr Preparation For Improvement And Widening To Intermediate Lane Configuration Of Nandprayag To Kothiyalsain Via Savrisain Motor Road In Badrinath Assembly Constituency Of Chamoli District Under Chardha
|
| Description |
Consultancy Servies For Feasibility Study And Dpr Preparation For Improvement And Widening To Intermediate Lane Configuration Of Nandprayag To Kothiyalsain Via Savrisain Motor Road In Badrinath Assembly Constituency Of Chamoli District Under Chardha
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_pwd_70699_1 |
|
Reference Number |
EE Letter No- 468/29 AC dt- 27-02-2024 |
| Tender Fee | 3540 |
| EMD | 92000 |
| Tender Value | - |
| Place | Gopeshwar |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=84916 |
| Start Date | March 02, 2024 17:30 |
| End Date |
Expired
07/03/2024
Expired 950 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for engagement of consultancy firm for conducting pre-feasibility study and preparation of detailed project report (dpr) of pumped storage projects (psps) in madhya pradesh
Rfp for engagement of consultancy firm for conducting pre-feasibility study and preparation of detailed project report (dpr) of pumped storage projects (psps) in madhya pradesh
Read moreConsultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha
Consultancy services for feasibility study and preparation of detailed project report (dpr) of widening to 4l road of barpalli- balangir -kesinga bhawanipatna -junagarh on nh 26 from 21/000 to 202/000 km excluding bhawanipatna bypass for odisha
Read moreConsultancy services for feasibility study and preparation of detailed project report (dpr) for 4 lane road from 0.000 km to 239.900 km (balangir to nayagarh) of nh-57 in the state of odisha for the year 2026-27
Consultancy services for feasibility study and preparation of detailed project report (dpr) for 4 lane road from 0.000 km to 239.900 km (balangir to nayagarh) of nh-57 in the state of odisha for the year 2026-27
Read moreConsultancy services for feasibility study and preparation of (dpr) for widening/upgradation to 2l/4l ps from barabanki to lakhimpur of nh727h (except from dewa to fatehpur (km 19.000 to km 39.000) in the state of uttar pradesh.
Consultancy services for feasibility study and preparation of (dpr) for widening/upgradation to 2l/4l ps from barabanki to lakhimpur of nh727h (except from dewa to fatehpur (km 19.000 to km 39.000) in the state of uttar pradesh.
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreConsultancy services for feasibility study and preparation of detailed project report (dpr) widening and strengthening of existing 2l to 2l ps from km 40/00 to 68/600km (podamari to mohana) of nh-326 and from km 0/00 to km 102/900 (mohana to paralak
Consultancy services for feasibility study and preparation of detailed project report (dpr) widening and strengthening of existing 2l to 2l ps from km 40/00 to 68/600km (podamari to mohana) of nh-326 and from km 0/00 to km 102/900 (mohana to paralak
Read morePre-feasibility study of refinery configuration of cpcl
Pre-feasibility study of refinery configuration of cpcl
Read moreConfiguration and pre-feasibility study for bina refinery expansion.
Configuration and pre-feasibility study for bina refinery expansion.
Read moreRoad safety works on nandprayag-devkhal motor road under badrinath assembly constituency in district chamoli. under road safety 2023-24.
Road safety works on nandprayag-devkhal motor road under badrinath assembly constituency in district chamoli. under road safety 2023-24.
Read moreOperational work of 66/33/11 kv substation kothiyalsain and 33/11 kv substation nandprayag under edsd chamoli against oandm head(2023-2024).
Operational work of 66/33/11 kv substation kothiyalsain and 33/11 kv substation nandprayag under edsd chamoli against oandm head(2023-2024).
Read moreof your Industry type