Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Civil Circle Removal Of Deposited Slush And Silt And Cleaning The Inside Surface Of Walls And Floor Of The Storage Water Tank 02 Near Cooling Water Pump House
|
| Description |
Mtps I Civil Circle Removal Of Deposited Slush And Silt And Cleaning The Inside Surface Of Walls And Floor Of The Storage Water Tank 02 Near Cooling Water Pump House
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_512933_1 |
|
Reference Number |
CE / MTPS-I / SE/ CIVIL / OT.NO. 44 / 2024-25 |
| Tender Fee | 0 |
| EMD | 2800 |
| Tender Value | - |
| Place | Mettur Thermal Power Station I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=609968 |
| Start Date | December 21, 2024 18:00 |
| End Date |
Expired
06/01/2025
Expired 649 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-kannankara thodu cleaning- premonsoon 2026-27 - urgent removal of deposited silt and debris from the mouth of kannankara thodu towards achenkovil river in pathanamthitt muncipality .-general civil work
Work is proposed to remove the accumulated silt and debris in the mouth portion of kannankara thodu near to achankovil river.
Read moreTtps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027
Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027
Read moreTtps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Read moreNctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMtps i - civil circle - removal of deposited slush and silt and cleaning the inside surface of walls and floor of the storage water tank-01 near cooling water pump house.
Mtps i - civil circle - removal of deposited slush and silt and cleaning the inside surface of walls and floor of the storage water tank-01 near cooling water pump house.
Read moreNctps i operation circle ca dn dredging the deposited silt slush from the fore bay of cooling water pump house at nctps i
Nctps i operation circle ca dn dredging the deposited silt slush from the fore bay of cooling water pump house at nctps i
Read moreMtps i - civil circle capital over haul 2025-26 cleaning of columns, beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in cooling tower-iv
Mtps i - civil circle capital over haul 2025-26 cleaning of columns, beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in cooling tower-iv
Read moreof your Industry type