Tender Details

Particulars Details
Title
Mtps I Civil Circle Removal Of Deposited Slush And Silt And Cleaning The Inside Surface Of Walls And Floor Of The Storage Water Tank 02 Near Cooling Water Pump House
Description
Mtps I Civil Circle Removal Of Deposited Slush And Silt And Cleaning The Inside Surface Of Walls And Floor Of The Storage Water Tank 02 Near Cooling Water Pump House
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_512933_1
Reference
Number
CE / MTPS-I / SE/ CIVIL / OT.NO. 44 / 2024-25
Tender Fee 0
EMD 2800
Tender Value -
Place Mettur Thermal Power Station I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=609968

Start Date December 21, 2024 18:00
End Date
Expired 06/01/2025

Expired 649 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027

Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027

Read more
Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of

Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of

Read more
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Read more
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Mtps i - civil circle - removal of deposited slush and silt and cleaning the inside surface of walls and floor of the storage water tank-01 near cooling water pump house.

Mtps i - civil circle - removal of deposited slush and silt and cleaning the inside surface of walls and floor of the storage water tank-01 near cooling water pump house.

Read more
Nctps i operation circle ca dn dredging the deposited silt slush from the fore bay of cooling water pump house at nctps i

Nctps i operation circle ca dn dredging the deposited silt slush from the fore bay of cooling water pump house at nctps i

Read more
Mtps i - civil circle capital over haul 2025-26 cleaning of columns, beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in cooling tower-iv

Mtps i - civil circle capital over haul 2025-26 cleaning of columns, beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in cooling tower-iv

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise