Tender Details

Particulars Details
Title
Construction Of 11 Kv Spur Line
Description
Construction Of 11 Kv Spur Line With Aaac Covered Conductor And Installation Of 500 Kva Pad Mounted Substation At Dibrugarh University Under Dibrugarh Esd I Of Dibrugarh Ec Apdcl
Organisation Assam Power Distribution Company Ltd | State Govt. and UT
Tender Id 2025_APDCL_48663_1
Reference
Number
CGM/APDCL/UAR/DIBRUGARH UNIVERSITY RETENDER/2025
Tender Fee 3000
EMD 1 Lakh
Tender Value -
Place Dibrugarh
Link
View Original Tender Notice

https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=77340

Start Date November 19, 2025 14:30
End Date
Expired 04/12/2025

Expired 286 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Conversion of 11 kv and lt overhead line network to underground cable network in market area in mancherial municipal corporation under nagarabhivrudhi fund.

Conversion of 11 kv and lt overhead line network to underground cable network in market area in mancherial municipal corporation under nagarabhivrudhi fund.

Read more
Construction of patancheru town section office in ground floor and ade lines in first floor in the premises of 33/11 kv indoor substation of patancheru mpdo office in patancheru division of sangareddy circle.

Construction of patancheru town section office in ground floor and ade lines in first floor in the premises of 33/11 kv indoor substation of patancheru mpdo office in patancheru division of sangareddy circle.

Read more
Rfp for aip of cluster-11 khammam hub

Rfp for aip of cluster-11 khammam hub

Read more
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.

Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.

Read more
Construction of box drain from hno: 3-11-102/106 to pavan tailors road no 21, bhavani nagar in ward no 20 - mallapur, circle 08 - nacharam, uppal zone, mmc

Construction of box drain from hno: 3-11-102/106 to pavan tailors road no 21, bhavani nagar in ward no 20 - mallapur, circle 08 - nacharam, uppal zone, mmc

Read more
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar

Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar

Read more
Supply of fly ash solid bricks (300x200x150mm) required for gdk-11 incline, rg.1 area

Supply of fly ash solid bricks (300x200x150mm) required for gdk-11 incline, rg.1 area

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Construction of jcos married accommodation of p-120, 125 and 126 affected in hasting line and stores (p-43 to p-47 and p-94) in 4trg bt. of eme center, due to the elevated corridor sh-01

Construction of jcos married accommodation of p-120, 125 and 126 affected in hasting line and stores (p-43 to p-47 and p-94) in 4trg bt. of eme center, due to the elevated corridor sh-01

Read more
Construction of bmc building

Construction of bmc building

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise