Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Renewals And Replacement Of Existing Centralized Air Conditioning System Of Ucb Control Rooms Of 2x250 Mw Unit 3 And 4 Stage Ii, Ghtp, Lehra Mohabbat
|
Description |
Renewals And Replacement Of Existing Centralized Air Conditioning System Of Ucb Control Rooms Of 2x250 Mw Unit 3 And 4 Stage Ii, Ghtp, Lehra Mohabbat
|
Organisation | Department of Power | State Govt. and UT |
Tender Id | 2024_POWER_131742_1 |
Reference Number |
162/MM-I/MAMC-268/OM/GHTP/2024 |
Tender Fee | 8260 |
EMD | 2.6 Lakh |
Tender Value | |
Place | DyCE,MM-1,GHTP,Lehra-Mohabbat |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=267461 |
Start Date | December 23, 2024 20:30 |
End Date |
13/01/2025 ( Expired 177 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of ball bearing for stage i and ii at ghtp, lehra mohabbat
Procurement of ball bearing for stage i and ii at ghtp, lehra mohabbat. total quantity as per nit.
Read moreProcurement of roller bearings for stage i and ii at ghtp, lehra mohabbat
Procurement of roller bearings for stage i and ii at ghtp, lehra mohabbat. total quantity as per nit.
Read moreUp gradation of air conditioning system of sldc server rooms and other rooms by providing centralized ac for entire sldc separate alternate lt line from other feeder and allied works as per requirement of uldc iii
Up gradation of air conditioning system of sldc server rooms and other rooms by providing centralized ac for entire sldc separate alternate lt line from other feeder and allied works as per requirement of uldc iii
Read moreComplete overhauling of electrical system of soot blowers and motor feeder modules of unit 3
Complete overhauling of electrical system of soot blowers and motor feeder modules of unit 3 of 3x210 mw, atps, anpara
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreProcurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Read moreSupply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Supply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Read morePercentage rate contract for chapter/section no. 3, 4, 5, 14, 17, 18, 19, 21, 22, 27 of mes ssr-2020 regarding repair/ rectification/ replacement of electrical supply system of industrial building and office building inside factory, jabalpur.
Percentage rate contract for chapter/section no. 3, 4, 5, 14, 17, 18, 19, 21, 22, 27 of mes ssr-2020 regarding repair/ rectification/ replacement of electrical supply system of industrial building and office building inside factory, jabalpur.
Read morePercentage rate contract for chapter/section no. 3, 4, 5, 14, 17, 18, 19, 21, 22, 27 of mes ssr-2020 regarding repair/ rectification/ replacement of electrical supply system of residential and non residential buildings in gcf estate jabalpur.
Percentage rate contract for chapter/section no. 3, 4, 5, 14, 17, 18, 19, 21, 22, 27 of mes ssr-2020 regarding repair/ rectification/ replacement of electrical supply system of residential and non residential buildings in gcf estate jabalpur.
Read moreProviding e i works replacement of ug cable switch disconnector fuse units for air conditioning system and main panel by pass system in assembly building agartala tripura west
Providing e i works replacement of ug cable switch disconnector fuse units for air conditioning system and main panel by pass system in assembly building agartala tripura west
Read moreof your Industry type