Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔋 Energy Audit Services Required For Ghtp, Lehra Mohabbat 🔋 The Department Of Power, State Government & Ut, Invites Bids From Experienced Professionals To Conduct An Energy Audit For Ghtp, Lehra Mohabbat, Units I To Iv, With Capacities Of 2x210 Mw And 2x250 Mw. 📅 Bid Submission Deadline: May 08, 2024, 10:00 Am Tender Fee: Inr 1770 Emd: Inr 20,000 Interested Bidders Should Possess The Necessary Qualifications And Experience In Conducting Energy Audits For Thermal Power Plants. Proposals Must Include Detailed Methodologies, Timelines, And Cost Estimates. Keywords: Energy Audit, Ghtp, Lehra Mohabbat, Thermal Power Plant, Department Of Power, State Government & Ut, Tender, Bid, Power Sector| Particulars | Details |
|---|---|
| Title |
To Conduct Energy Audit Of Ghtp Lehra Mohabbat Unit No I To Iv Having Capacities Of 2 210 M Wand 2x250 Mw
|
| Description |
To Conduct Energy Audit Of Ghtp Lehra Mohabbat Unit No I To Iv Having Capacities Of 2 210 M Wand 2x250 Mw
|
| Organisation | Department of Power | State Govt. and UT |
| Tender Id | 2024_POWER_120192_1 |
|
Reference Number |
02/ CE-28/FET/GHTP/2024 |
| Tender Fee | 1770 |
| EMD | 20000 |
| Tender Value | |
| Place | GHTP, LEHRA MOHABAT |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=245512 |
| Start Date | March 14, 2024 22:30 |
| End Date |
Expired
08/05/2024
Expired 782 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provn of security fencing and gate to bldg no t-442 of 118 (i) inf bde gp pro unit at nimu mil stn under age (i) nimu
Provn of security fencing and gate to bldg no t-442 
 of 118 (i) inf bde gp pro unit at nimu mil stn under age (i) nimu 
Read moreProviding paver block above utility pipe lines trench area near paltech cooling tower and approach to boiler no.1, 2, 3 and 4 at tnpl unit i
Providing paver block above utility pipe lines trench area near paltech cooling tower and approach to boiler no.1, 2, 3 and 4 at tnpl unit i
Read moreN1 reducing valve overhauling kit consisting of 5 items (i) o ring 3/4 to wabco part no. 531868/ faiveley part no. 502702000 to rdso drg no. skdp-3031(item no.4), qty/set -02 nos. (ii) o ring 3/4 to wabco part no. 564056/ faiveley part no. 502709000 to rdso drg no. skdp-3031 (item no.16), qty/set -01 no. (iii) diaphragm to wabco part no. 526346/ faiveley part no. 502704000 to rdso drg no. skdp 3052, qty/set -01 no. (iv) gasket to wabco part no. 558515/ faiveley part no. 523703000, qty/set -02
For complete deion and other details, please refer to tender
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreTo conduct energy audit of ghtp lehra mohabbat unit no i to iv having capacities of 2x210 mwand 2x250 mw
To conduct energy audit of ghtp lehra mohabbat unit no i to iv having capacities of 2x210 mw and 2x250 mw
Read moreCooling water treatment units of stage-1 of 2x210 mw and stage-2 of 2x250 mw ghtp lehra mohabbat
Cooling water treatment units of stage-1 of 2x210 mw and stage-2 of 2x250 mw ghtp lehra mohabbat
Read moreCooling water treatment units of stage 1 of 2x210 mw and stage 2 of 2x250 mw ghtp lehra mohabbat
Cooling water treatment units of stage 1 of 2x210 mw and stage 2 of 2x250 mw ghtp lehra mohabbat
Read moreResidual life assessment study (rla study) of boilers of 210 mw unit-ii. ghtp, lehra mohabbat
Residual life assessment study (rla study) of boilers of 210 mw unit-ii. ghtp, lehra mohabbat
Read moreReplacement and machining of turbine valves for 210 mw unit-ii and 250 mw unit-iii of ghtp, lehra mohabbat
Replacement and machining of turbine valves for 210 mw unit-ii and 250 mw unit-iii of ghtp, lehra mohabbat
Read moreProcurement of baskets (heating elements) for aphs of stage-i (210 mw) units of ghtp, lehra mohabbat.
Procurement of baskets (heating elements) for aphs of stage-i (210 mw) units of ghtp, lehra mohabbat.
Read moreof your Industry type