Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Underground Drainage System At Village
|
| Description |
Underground Drainage System At Village
|
| Organisation | RDD-CEO-AURANGABAD | State Govt. and UT |
| Tender Id | 2025_AURAN_1143773_1 |
|
Reference Number |
Etender/CHINCHPUR/2024/2025 |
| Tender Fee | 501 |
| EMD | 1 |
| Tender Value | - |
| Place | Grampanchayat Office |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1991591 |
| Start Date | January 30, 2025 14:30 |
| End Date |
Expired
04/02/2025
Expired 608 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreUnderground drainage system at village
Underground drainage &#x0d system at village &#x0d
Read moreUnderground drainage system dattawadi at village
Underground drainage system dattawadi at village
Read moreUnderground drainage system indira nagar at village
Underground drainage&#x0d system indira nagar at village
Read moreUnderground drainage system at village sirasgaon tq.vaijapur
Underground drainage system at village sirasgaon tq.vaijapur
Read moreUnderground drainage system at village sirasgaon tq.vaijapur
Underground drainage system at village sirasgaon tq.vaijapur
Read moreof your Industry type