Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cs For Ae For Supervision Of Balance Work Of 4 Lane With Paved Shoulder Configuration Of The Highway Ing From Km88.400 (Savali Vihir) To Km163.400 (Ahmednagar Bypass)(Length 75.000 Km) Section Of Nh 160 In Maharashtra Under Bmp On Epc Mode
|
| Description |
Cs For Ae For Supervision Of Balance Work Of 4 Lane With Paved Shoulder Configuration Of The Highway Ing From Km88.400 (Savali Vihir) To Km163.400 (Ahmednagar Bypass)(Length 75.000 Km) Section Of Nh 160 In Maharashtra Under Bmp On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_215929_1 |
|
Reference Number |
MHDIV-25/1/2024-Maharashtra and Goa Division/E-266849 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=238843 |
| Start Date | November 23, 2024 00:25 |
| End Date |
Expired
06/01/2025
Expired 539 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreUpgrad to 4lane with paved shoulder config. of highway ing frm exist. km88.400(savali vihir)to km163.400(start of ahmednagar bypass)(length 75.000km)sec of nh160 in maharashtra under bmp on ham mode.
Upgrad to 4lane with paved shoulder config. of highway ing frm exist. km88.400(savali vihir)to km163.400(start of ahmednagar bypass)(length 75.000km)sec of nh160 in maharashtra under bmp on ham mode.
Read moreBalance work of upgrad to 4 lane with paved shoulder config of the highway ing from km 88.400 (savali vihir) to km 163.400 (start of ahmednagar bypass)(l75.000km) sec of nh160 in maharashtra under bmp on epc mode.
Balance work of upgrad to 4 lane with paved shoulder config of the highway ing from km 88.400 (savali vihir) to km 163.400 (start of ahmednagar bypass)(l75.000km) sec of nh160 in maharashtra under bmp on epc mode.
Read moreConstruction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of kasrawad bypass, selani bypass, khargone bypass and bistan bypass (total length 31.950) section of nh-347c to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Construction of morena bypass, ambah bypass and porsa bypass (total length 27.16km) and ater realignment to bhind bypass (total length 21.50 km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of mp on epc mode
Read moreConsultancy services for authoritys engineer for supervision of construction of paderu bypass of 2 lane with paved shoulder configuration on nh 516e in the state of andhra pradesh under nh o on epc mode
Consultancy services for authoritys engineer for supervision of construction of paderu bypass of 2 lane with paved shoulder configuration on nh 516e in the state of andhra pradesh under nh o on epc mode
Read moreNew construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
New construction of ater realignment and bhind bypass (total length 21.50km) section of nh-552 ext. to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreof your Industry type