Tender Details
Particulars | Details |
---|---|
Title |
Installation Of 6 Inch Pipe Range For 38 Lps Pump And Shifting Of 3.3 Kv Substation No.2 In Rviic Seam Of Cm Project At Nakrakonda Kumardihi B Colliery Under Bankola Area.
|
Description |
Installation Of 6 Inch Pipe Range For 38 Lps Pump And Shifting Of 3.3 Kv Substation No.2 In Rviic Seam Of Cm Project At Nakrakonda Kumardihi B Colliery Under Bankola Area.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_327586_1 |
Reference Number |
ECL/GM/BA/E TENDER/24-25/ENM/423 Dt 31.01.2025 |
Tender Fee | 0 |
EMD | 13200 |
Tender Value | |
Place | Nakrakonda Kumardihi B Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339533 |
Start Date | January 31, 2025 23:30 |
End Date |
10/02/2025 ( Expired 94 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Different type of pumping and pipeline work i.e, shifting and installation of 4000 gpm pump and shifting of 10 and 8 inch pipe at jocp main sump for dewatery of abocp mine, under block-ii area
Different type of pumping and pipeline work i.e, shifting and installation of 4000 gpm pump and shifting of 10 and 8 inch pipe at jocp main sump for dewatery of abocp mine, under block-ii area
Read moreReplacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Replacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Read moreShifting of bike stand from siding no. 2 to 8 no pit area under bankola colliery.
Shifting of bike stand from siding 
 no. 2 to 8 no pit area under bankola colliery.
Read moreSupply and installation of 3.3 kv grade neutral grounding resistor (ngr) with safety features at 10no. substation of sarubera project under kuju area
Supply and installation of 3.3 kv grade neutral grounding resistor (ngr) with safety features at 10no. substation of sarubera project under kuju area
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreConstruction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.
Construction of 15 nos (fifteen) isolation stoppings to isolate the proposed panels pb 3 and pb 4 in rviib seam of cm project under nakrakonda kumardihi b colliery.
Read moreLaying /dismantling /rearrangement of 8, 6 and 4 inch ms/gi pipe lines and dismantling, shifting and installation of pump for a period of 01 years at baroud ocm, of secl, raigarh area.
Laying /dismantling/ rearrangement of 8, 6 and 4 inch ms/gi pipe lines and dismantling, shifting and installation of pump for a period of 01 years at baroud ocm, of secl, raigarh area.
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreSupply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.
Read moreMaking pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Making pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Read moreof your Industry type