Tender Details

Particulars Details
Title
Construction Of Permanent Support By Constructing Side Support Wall And Brick Pillar In Between 8 D 7 D/31 L 30 L In Kenda (R Vi) Seam Of Bansra Colliery Under Kunustoria Area
Description
Construction Of Permanent Support By Constructing Side Support Wall And Brick Pillar In Between 8 D 7 D/31 L 30 L In Kenda (R Vi) Seam Of Bansra Colliery Under Kunustoria Area
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_335862_1
Reference
Number
GM/KNT/CMC/NIT/25-26/664 Dt. 20.05.2025
Tender Fee 0
EMD 33300
Tender Value
Place Bansra Colliery, Kunustoria Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348197
Start Date May 24, 2025 22:30
End Date

03/06/2025 ( Expired 33 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of concrete drain from daspur electric office towards maity para by the side of daspur rural hospital at daspur ii gp under daspur i panchayat samity area in the district of paschim medinipur.(activity code- 123882329) (15th cfc 2025- 26

Construction of concrete drain&amp#x0d from daspur electric office&amp#x0d towards maity para by the side&amp#x0d of daspur rural hospital at&amp#x0d daspur ii gp under daspur i&amp#x0d panchayat samity area in the&amp#x0d district of paschim&amp#x0d medinipur.

Read more
Construction of wharf wall and side drain at railway siding at bhanora colliery under satgram-sripur area(re-tender)

Construction of wharf wall and side drain at railway siding at bhanora colliery under satgram-sripur area(re-tender)

Read more
Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar

Construction of 14 nos. of sectionalisation stoppings to sectionalise rise side above shaft level of pit no. 2 upto the mine boundary in r-v (satgram) seam, j. k. nagar&#x0d colliery&#x0d

Read more
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Read more
Construction of 06 nos sectionalisation stoppings in between panel 7 by 6 and panel 8 of rvii seam at 3 and 4 incline unit under jpc

Construction of 06 nos sectionalisation stoppings in between panel 7 by 6 and panel 8 of rvii seam at 3 and 4 incline unit under jpc

Read more
Construction of side wall at no 01 incline rana seam r-v 04l to 06l at bhanora west block colliery

Construction of side wall at no 01 incline rana seam r-v 04l to 06l at bhanora west block colliery

Read more
Construction of 7 nos.of isolation stoppings(02nos. full and 05 nos. preparatory stopping), for proposal panel w-x1(a) at no. 3 and 4 pit in nega rvlll seam under nimcha(r)colliery

Construction of 7 nos.of isolation stoppings(02nos. full and 05 nos. preparatory stopping), for proposal panel w-x1(a) at no. 3 and 4 pit in nega rvlll seam under nimcha(r)colliery

Read more
New supply, installation n commissioning of ug flp lighting arrangement for pump station, switch station, sub-station and travelling road way of 8d n 30l development district at bansra colliery under kunustoria area

New supply, installation n commissioning of ug flp lighting arrangement for pump station, switch station, sub-station and travelling road way of 8d n 30l development district at bansra colliery under kunustoria area

Read more
Construction of foot steps along 28l drift (travelling road of 08d/28l dev. dist.) in kenda (r-vi) seam of bansra colliery under kunustoria area

Construction of foot steps along 28l drift (travelling road of 08d/28l dev. dist.) in kenda (r-vi) seam of bansra colliery under kunustoria area

Read more
Construction of 10 (ten) nos. ventilation stopping for 53r/30l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area

Construction of 10 (ten) nos. ventilation stopping for 53r/30l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise