Tender Details

Particulars Details
Title
Improvement Of Hotmix Plant Road And Footpath Work From R And O Block Petrol Pump Kath Bridge Under Ward 48 Zone 5
Description
Improvement Of Hotmix Plant Road And Footpath Work From R And O Block Petrol Pump Kath Bridge Under Ward 48 Zone 5
Organisation Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT
Tender Id 2025_NNKAN_1038807_1
Reference
Number
130/AA5/25-26
Tender Fee 2714
EMD 3 Lakh
Tender Value
Place Ward 48
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1883626
Start Date May 14, 2025 14:30
End Date

21/05/2025 ( Expired 17 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Read more
Construction of b.t. road work at shaere-a-panjab hotel to madhav nagar gate ward no. 58 zone no. 13 file no. 17/25x3/5

Construction of b.t. road work at shaere-a-panjab hotel to madhav nagar gate ward no. 58 zone no. 13 file no. 17/25x3/5

Read more
Maintenance and construction of dammage b.t. road work at zone no. 08,09 and 10 file no. 16/25x3/5

Maintenance and construction of dammage b.t. road work at zone no. 08,09 and 10 file no. 16/25x3/5

Read more
Repair to internal road in zone-iii and adjacent area under age b/r-ii of ge (north) meerut cantt

Repair to internal road in zone-iii and adjacent area under age b/r-ii of ge (north) meerut cantt

Read more
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.

Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.

Read more
Construction of boundary wall, pathway, gajibo fountain and other necessary work in the nilkanth colony garden under ward no. 07 zone no.01.

Construction of boundary wall, pathway, gajibo fountain and other necessary work in the nilkanth colony garden under ward no. 07 zone no.01.

Read more
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak

Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise