Tender Details
Particulars | Details |
---|---|
Title |
Interlinking Work From Shankar Pajapati S House To Sualal Kashyap S House And From Punnu Lal S House To Harpal S House In Nawada Forest.
|
Description |
Interlinking Work From Shankar Pajapati S House To Sualal Kashyap S House And From Punnu Lal S House To Harpal S House In Nawada Forest.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_REDUP_810958_1 |
Reference Number |
3210/03/EE/RED/2022-23 Date 31-03-2023 |
Tender Fee | 2354 |
EMD | 57000 |
Tender Value | |
Place | EE RED SECOND FLOOR VIKAS BHAWAN BAREILLY |
Link | https://etender.up.nic.in |
Start Date | June 12, 2023 15:30 |
End Date |
26/06/2023 ( Expired 685 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Read moreCs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Read moreDpr and preconstruction activities for rehabilitation and upgradation of forest stretches in sarsam to kothari ch. km 33.000 to km 90.000 and kothari to dhanoda ch. km 90.000 to km 147.650) of nh 161a to 2lps configuration in the state of maharashtra
Dpr and preconstruction activities for rehabilitation and upgradation of forest stretches in sarsam to kothari ch. km 33.000 to km 90.000 and kothari to dhanoda ch. km 90.000 to km 147.650) of nh 161a to 2lps configuration in the state of maharashtra
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreof your Industry type