Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Repairing And Painting Of Western Block Corridor Of Biotechnology Dept 4th Floor At Ballygunge Science College Campus, C.U.
|
Organisation | UNIVERSITY OF CALCUTTA | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 17000 |
Tender Value | |
Place | BALLYGUNGE SCIENCE COLLEGE CAMPUS, C.U. |
Link |
AAAAAAAAAA Login to view |
Start Date | May 23, 2025 23:30 |
End Date |
09/06/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vertical extension-4th and 5th floor of institute block at the west bengal national university of juridical sciences, salt lake, kolkata-700106-sitc of air conditioning system.
Construction of vertical extension-4th and 5th floor of institute block at the west bengal national university of juridical sciences, salt lake, kolkata-700106-sitc of air conditioning system.
Read moreAAAAAAAAAA
Login to viewRepairing and renovation of office building at west bank division, howrah, padmapukur campus.
Read moreSupply and commissioning of 02(two) nos of c-arm machines in dept of urology at medical college, kolkata
Supply and commissioning of 02(two) nos of c-arm machines in dept of urology at medical college, kolkata
Read moreAAAAAAAAAA
Login to viewC/o teaching and research lab (g plus 4) for indian institute of science education and research (iiser) at bhopal (m.p.). on epc (mode-1). sh: planning, designing and construction of teaching and research lab (g plus 4) consisting of two no. central instrument facility (cif) hall (at g.f.), 24 nos. research lab (6 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), 24 nos. research lab (6 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), 24 nos. faculty room (6 nos. each at 1st floor, 2nd floor, 3rd floor, and 4 floor), 4 nos. academic lab (1 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), ahu rooms, toilets with modular cubical and modular urinal partitions, other rooms (as per architectural drawings), accessible ramps, parking area, accessible road around the building and nearby development etc. including internal water supply, sanitary installation, drainage, all e and m services such as internal e/i ......... including development with bim models.
Read moreConstruction of light weight structure over the roof of derozio building for proposed nalinikanta bramho school of data science and public policy at presidency university college street campus kolkata 700073 during the year 2024 2025 electrical insta
Construction of light weight structure over the roof of derozio building for proposed nalinikanta bramho school of data science and public policy at presidency university college street campus kolkata 700073 during the year 2024 2025 electrical insta
Read moreSitc of dg set
Construction of g plus 3 storied building for 50 beded critical care block at malda medical college and hospital, malda-sitc of dg set
Read moreSitc of fire detection and alarm system
Construction of g plus 3 storied building for 50 beded critical care block at malda medical college and hospital, malda-sitc of fire detection and alarm system
Read moreCa no. ge af no.1/gur-23/2025-26 repair/ replacement of joinery incl upvc doors/windows, roofing, plastering, grit wash ,floor/wall tile and other br works in domestic area and g-block at 54asp under ge (af) gurgaon no.1
Ca no. ge af no.1/gur-23/2025-26 repair/ replacement of joinery incl upvc doors/windows, roofing, plastering, grit wash ,floor/wall tile and other br works in domestic area and g-block at 54asp under ge (af) gurgaon no.1
Read moreCost estimate for repairing and painting of 220 kv c.t.,c.b., c.v.t. junction boxes, isolator / earth switch mom boxes, etc. installed in 220 k.v. switchyard at 400 k.v. sub station motiram adda,gorakhpur
Cost estimate for repairing and painting of 220 kv c.t.,c.b., c.v.t. junction boxes, isolator / earth switch mom boxes, etc. installed in 220 k.v. switchyard at 400 k.v. sub station motiram adda,gorakhpur
Read moreConstruction of roof truss at the top floor of three storied boys hostel of north bengal dental college and hospital.nit/5/25-26
Construction of roof truss at the top floor of three storied boys hostel of north bengal dental college and hospital.
Read moreof your Industry type