Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation Of Earth By Mechanical Device, Supply And Filling Of Earth With Compaction By Mechanical Device At Different Area Under The Jurisdiction Of Rd Jirania Division
|
| Description |
Excavation Of Earth By Mechanical Device, Supply And Filling Of Earth With Compaction By Mechanical Device At Different Area Under The Jurisdiction Of Rd Jirania Division
|
| Organisation | Chief Engineer, Rural Development Department | State Govt. and UT |
| Tender Id | 2025_CERDD_68588_2 |
|
Reference Number |
e-PT-07/EARTH-CUT/EE/JRN DT-20/12/2025 |
| Tender Fee | 1000 |
| EMD | 40000 |
| Tender Value | - |
| Place | As per DNIT |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=70024 |
| Start Date | January 03, 2026 23:00 |
| End Date |
Expired
12/01/2026
Expired 221 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
E-quotation for supplying, installation, testing and commissioning of vertical turbine pump set with all required electromechanical accessories at raw water of mango urban water supply scheme under d.w. and s mechanical division jamshedpur
E-quotation for supplying, installation, testing and commissioning of vertical turbine pump set with all required electromechanical accessories at raw water of mango urban water supply scheme under d.w. and s mechanical division jamshedpur
Read moreRepair maintenance of external water supply pipe line pumpset and cleaning of borewell sump etc at zone a area under ge navy chennai
Repair maintenance of external water supply pipe line pumpset and cleaning of borewell sump etc at zone a area under ge navy chennai
Read moreCreation of 63 kva sub station along with ht/lt network at malik mohalla nagisheran bala and augmentation of 25 kva by 63 kva sub station shalidora astanpora under capex 2026-27
Creation of 63 kva sub station along with ht/lt network at malik mohalla nagisheran bala and augmentation of 25 kva by 63 kva sub station shalidora astanpora under capex 2026-27
Read moreTurnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle begusarai, darbhanga, saharsa, kishanganj and purnea under package-3 envelope under o&m capital head/internal resource fund (irf), o&m department, nbpdcl
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle begusarai, darbhanga, saharsa, kishanganj and purnea under package-3 envelope under o&m capital head/internal resource fund (irf), o&m department, nbpdcl
Read moreTurnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, muzaffarpur and motihari under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, muzaffarpur and motihari under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.
Read moreSupplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one m
Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one meter average cover over the pipe with disposal of excavated earth within initial lead and lift with disinfection of pipes, testing of pipes against 60 m water head etc. to protect against corrosion pipes are given epoxy lining or hot applied coal tar/ asphalt lining or rich cement mortar lining at works or in the field by the centrifugal process. the outer coating for pipe may be in cement sand guniting or hot applied coal- tar asphaltic enamel reinforced with fibre glass fabric yarn as per cpheeo manual of water supply and treatment all complete job as per standard specification. 600 mm dia (minimum thickness- 6.40 mm)
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type