Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚰 Procurement Opportunity: Drinking Water Supply At 132 Kv Sub Station 🏭 Up Power Transmission Corp.Ltd (Operation), On Behalf Of The State Government And Union Territories, Is Seeking Bids For The Supply Of Drinking Water At The 132 Kv Sub Station In Kosi Kalan, Upsidc, Under The Electrical Training Department (Etd) Mathura. 📅 Bid Submission Deadline: May 01, 2024, 1:00 Pm Tender Fee: Inr 590 Emd: Inr 2000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And Operational Plans, To Meet The Drinking Water Needs Of The Sub Station. Keywords: Drinking Water Supply, 132 Kv Sub Station, Up Power Transmission Corp.Ltd, Etd Mathura, State Govt. And Ut, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Work
|
| Description |
Supplying Drinking Water At 132 Kv Sub Station Kosi Kalan Upsidc Under Etd Mathura
|
| Organisation | UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT |
| Tender Id | 2024_UPTCL_919514_1 |
|
Reference Number |
ET-41/ETC(M)/23-24 |
| Tender Fee | 590 |
| EMD | 2000 |
| Tender Value | |
| Place | Under ETC Mathura |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1588720 |
| Start Date | March 20, 2024 22:30 |
| End Date |
Expired
01/05/2024
Expired 766 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renovation of petanalla from rd 00 m to 2700m with structures including balance work of phase-i in cuttack city from rd 0.00 m (outfalls) to rd 1090m (aswini hospital bridge), reach iii
Stone work, earth work, structural work, sheet pile work.
Read moreGeneral construction of ramp at rest house providing ramp facilities at rest house kanjirappally, mundakkayam and erumely - general civil work
Dismantling work, brick work,stainless steel work, gi sheet roofing work plastering etc
Read moreWork proposed 11 0.4 kv distribution transformer increasing capacity, 33 kv vcb work, switch yard work and strengthening work of 33 kv line work
Work proposed 11 0.4 kv distribution transformer increasing capacity, 33 kv vcb work, switch yard work and strengthening work of 33 kv line work
Read moreGeneral-investigation work for areecode parallel bridge in eranad lac, malappuram district.-investigation work-investigation work
General-investigation work for areecode parallel bridge in eranad lac, malappuram district.-investigation work-investigation work
Read moreof your Industry type