Tender Details
Particulars | Details |
---|---|
Title |
Pcc Lining Work And Restoration Of Structures Of Raneshwar Distributory Originating From Mayurakshi Left Bank Canal Under Dist. Dumka
|
Description |
Pcc Lining Work And Restoration Of Structures Of Raneshwar Distributory Originating From Mayurakshi Left Bank Canal Under Dist. Dumka
|
Organisation | WRD EinC Major-Med n Minor | State Govt. and UT |
Tender Id | 2025_WRD_99440_1 |
Reference Number |
WRD/DMK/SBD-IFB-5/24-25/4thCal |
Tender Fee | 10000 |
EMD | 15.12 Lakh |
Tender Value | |
Place | Raneshwar, Dist - Dumka |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=133574 |
Start Date | March 10, 2025 23:30 |
End Date |
03/04/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreMaintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreYearly contract for removal of lead shots from firing butts and topping of existing sand with fresh sand and minor repair work in various butts of range complex, including pistol range under rfi control and 550m sniper tunnel of sqae.
Yearly contract for removal of lead shots from firing butts and topping of existing sand with fresh sand and minor repair work in various butts of range complex, including pistol range under rfi control and 550m sniper tunnel of sqae.
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreConstruction of drain from kushwaha house to neha boutique in narmada nagar under chitranjan das ward and road construction work from agarwal house to soni house and from sanjay flour mill to master house under zone no. 14
Construction of drain from kushwaha house to neha boutique in narmada nagar under chitranjan das ward and road construction work from agarwal house to soni house and from sanjay flour mill to master house under zone no. 14
Read moreWork of renovation and revamping of 2x6.3 mva, 33/11kv velim substation and enhancing the capacity of substation from 2x6.3mva to 2x6.3mva, 1x10mva under the jurisdiction of sub div ii, chinchinim, division xvi, margao
Work of renovation and revamping of 2x6.3 mva, 33/11kv velim substation and enhancing the capacity of substation from 2x6.3mva to 2x6.3mva, 1x10mva under the jurisdiction of sub div ii, chinchinim, division xvi, margao
Read moreConstruction work of covered drain from union bank atm to falak parlor in sanjay gandhi ward under zone no. 16.
Construction work of covered drain from union bank atm to falak parlor in sanjay gandhi ward under zone no. 16.
Read moreof your Industry type