Tender Details
Particulars | Details |
---|---|
Title |
Water Supply Scheme Under Jjm Of Sepahijala District. / Sh Construction Of 1 No 20,000 Gallon Capacity Rcc Under Ground Reservoir With Pump House, Installation Of Pump Motor, Laying Of Distribution Pipe Line Including Construction Of 4 Nos. Sbdtw A
|
Description |
Water Supply Scheme Under Jjm Of Sepahijala District. / Sh Construction Of 1 No 20,000 Gallon Capacity Rcc Under Ground Reservoir With Pump House, Installation Of Pump Motor, Laying Of Distribution Pipe Line Including Construction Of 4 Nos. Sbdtw A
|
Organisation | Chief Engineer, PWD (DWS) | State Govt. and UT |
Tender Id | 2025_CEDWS_60270_1 |
Reference Number |
12/EE/DWS/BLG/2025-26 |
Tender Fee | 1000 |
EMD | 98196 |
Tender Value | |
Place | Kathalia |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=61294 |
Start Date | April 10, 2025 23:30 |
End Date |
01/05/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreConstruction of 450 cum capacity 20 mtr stating height rcc over head reservoir including pipe connection cost of pipes, specials at tetikhola h/w site of piped water supply scheme under rcfa division-i phe dte.
Construction of 450 cum capacity 20 mtr stating height rcc over head reservoir including pipe connection cost of pipes, specials at tetikhola h/w site of piped water supply scheme under rcfa division-i phe dte.
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreRepair/maint replacement of unserviceable raw water pipe lines to yph and all type of water supply distribution pipe line, pump sets motor, stater panel and other connected items at dunkrik line under age e/m-i at ge (central) khadki.
Repair/maint replacement of unserviceable raw water pipe lines to yph and all type of water supply distribution pipe line, pump sets motor, stater panel and other connected items at dunkrik line under age e/m-i at ge (central) khadki.
Read moreConstruction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Construction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Read moreWork of construction of sources, rising main pipelines, cwr, ohsr, pump house, internal village distribution pipeline and fhtc including one year dlp of rajpur chhota under sub division reni under jjm in the jurisdiction of phed division rajgarh
Work of construction of sources, rising main pipelines, cwr, ohsr, pump house, internal village distribution pipeline and fhtc including one year dlp of rajpur chhota under sub division reni under jjm in the jurisdiction of phed division rajgarh
Read moreBalance work of retrofitting piped water supply scheme under jal jeevan mission at village dulhai block pichhore distt shivpuri based on tube well including installation of electric submersible water motor pump, laying and jointing distribution pipe
Balance work of retrofitting piped water supply scheme under jal jeevan mission at village dulhai block pichhore distt shivpuri based on tube well including installation of electric submersible water motor pump, laying and jointing distribution pipe
Read moreConstruction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec
Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec
Read moreProviding tap connections to consumers, extension and augmentation of water supply system at sunam distt. sangrur for distribution network installation of tubewells and construction of 1.0 lakh gallon ohsr under amrut 2.0 scheme part-1 phase-1
Providing tap connections to consumers, extension and augmentation of water supply system at sunam distt. sangrur for distribution network installation of tubewells and construction of 1.0 lakh gallon ohsr under amrut 2.0 scheme part-1 phase-1
Read moreConstruction of platforms along with approach, restrengthening of sna storage house at nac area and laying of mastic acid resistance tiles under acid line (above the ground) between nac sac plant in acid section area, at o.f.bhandara.
Construction of platforms along with approach, restrengthening of sna storage house at nac area and laying of mastic acid resistance tiles under acid line (above the ground) between nac sac plant in acid section area, at o.f.bhandara.
Read moreof your Industry type