Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rcc Pipe Line
|
Description |
Removal Of Water Stagnation In Front Of Cream Stone Rasoolpura, By Laying Of 600mm Dia Rcc Pipe Line In Ward 149 Begumpet Circle 30 Secunderabad Zone Ghmc
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 163 |
EMD | 4590 |
Tender Value | |
Place | TS |
Link |
AAAAAAAAAA Login to view |
Start Date | June 23, 2025 19:10 |
End Date |
01/07/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreRepairing of valves of condensate line steam drain lines feed water lines hp bypass spray line control valves pumps spare of 2x500 mw b tps anpara
Repairing of valves of condensate line steam drain lines feed water lines hp bypass spray line control valves pumps spare of 2x500 mw b tps anpara
Read moreProviding pipe line in sc area of lakshmipuram of devarapalli mandal. est rs 4.00 / 8.00
Providing pipe line in sc area of lakshmipuram of devarapalli mandal est rs 4.00/8.00 lakhs
Read morePipe, seamless, confirming to astm a 333 gr-6, size-2" nb, schedule-160,pipe, seamless, confirming
Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of rcc drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Construction of rcc drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Read moreof your Industry type