Tender Details
About Tender
🛣️ Ground Patrol Opportunity For Pipeline Security 🚫 Oil India Limited, A Leading Public Sector Undertaking, Is Seeking Bids From Reputable Firms To Provide Ground Patrolling Services For A Segment Of Its Pipeline. The Scope Of Work Involves Engaging Line Walkers For The Route Between Pl Km 920.000 And Pl Km 1058.000, Under Pump Station 9, For A Period Of Four Years. 📅 Bid Submission Deadline: June 18, 2024, 11:00 Am The Location Of The Project Is Ps9 Dumar Bihar. There Is No Tender Fee Or Earnest Money Deposit Required To Participate In This Bid. Interested Parties Should Submit Detailed Proposals, Including Methodology, Safety Protocols, And Cost Estimates, By The Specified Deadline. Keywords: Ground Patrolling, Pipeline Security, Line Walkers, Oil India Limited, Public Sector Undertaking, Bid, Proposal Submission, Ps9 Dumar BiharParticulars | Details |
---|---|
Title |
Ground Patrolling Of The Pipeline Row By Engaging Line Walkers From Pl Km 920.000 To Pl Km 1058.000 Under Pump Station 9 For A Period Of 04 Years
|
Description |
Ground Patrolling Of The Pipeline Row By Engaging Line Walkers From Pl Km 920.000 To Pl Km 1058.000 Under Pump Station 9 For A Period Of 04 Years
|
Organisation | Oil India Limited | Public Sector Undertakings |
Tender Id | T1607271 |
Reference Number |
CGI5834P24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | PS9 DUMAR BIHAR |
Link | https://www.oil-india.com/pdf/tenders/national/DOC_CGI5834P24.pdf |
Start Date | May 15, 2024 12:30 |
End Date |
18/06/2024 ( Expired 330 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreProviding life insurance benefits for the employees workmen for the period from 31.07.2025 to 30.07.2026 under group insurance scheme in lieu of employees deposit linked insurance scheme as per epf mp act 1952
Providing life insurance benefits for the employees workmen for the period from 31.07.2025 to 30.07.2026 under group insurance scheme in lieu of employees deposit linked insurance scheme as per epf mp act 1952
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreSelection of agency for door to door collection, segregation of municipal solid wastye msw from each establishment and transportation to the mrf centres transfer stations processing site for a period of seven years.
Selection of agency for door to door collection, segregation of municipal solid wastye msw from each establishment and transportation to the mrf centres transfer stations processing site for a period of seven years.
Read moreRestoration of bituminous and concrete road by damage due to laying of pipeline from 1) rabinsen existing pump house to ohrs dumping ground ptop pump house to ohrs of raniganj area 2nd call
Restoration of bituminous and concrete&#x0d road by damage due to laying of pipeline&#x0d from&#x0d 1) rabinsen existing pump house to ohrs&#x0d dumping ground ptop pump house to ohrs of&#x0d raniganj area 2nd call
Read moreConclusion of price agreement of 23 consumables for a period of two years for the department of pathology on ote/ two bid basis inhs asvini
Conclusion of price agreement of 23 consumables for a period of two years for the department of pathology on ote/ two bid basis inhs asvini
Read moreRepair maintenance for attending day to day on line complaints of area b at naval dockyard visakhapatnam under ge(i) dm visakhapatnam
Repair maintenance for attending day to day on line complaints of area b at naval dockyard visakhapatnam under ge(i) dm visakhapatnam
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreHiring of long chasis (10t capacity non-tipper) for use at pvk5 inc, kgm area for a period of 5 years by floating open enquiry under unit rate system, kgm area.
Hiring of long chasis lorry (10t capacity non- tipper) for use at pvk 5 inc, kgm area for a period of 5 years by floating open enquiry under unit rate system, kgm area
Read moreof your Industry type