Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Plan 2023 24 Pmla 53
|
| Description |
Annual Plan 2023 24 Pmla 53
Renovation Of Kochukarikkakam Subcenter In
Peringammala Gp
|
| Organisation | Government of Kerala |
| Tender Id | 2023_LSGD_600471_1 |
|
Reference Number |
25/2023/AE/LSGD/PMLA |
| Tender Fee | 935 |
| EMD | 10586 |
| Tender Value | - |
| Place | Peringamala GP |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | September 07, 2023 16:30 |
| End Date |
Expired
14/09/2023
Expired 1105 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreAnnual plan 2023-24 -pmla
Annual plan 2023-24 -pmla 176- kuttimoodu road concreating at peringammala gp
Read moreAnnual plan-annual plan 2023-24 pmla 60
Annual plan-annual plan 2023-24 pmla 60 shmashanam manthuruthy road concreting in peringammala gp
Read more-annual plan 2023-24 pmla 190
-annual plan 2023-24 pmla 190 paraykkonam muthipara road concreting in peringammala gp
Read moreAnnual plan 2023-24 pmla 177
Annual plan 2023-24 pmla 177 pappanamcode eda road concreting in peringammala gp
Read moreAnnual plan 2023-24 pmla 68
Annual plan 2023-24 pmla 68 construction of karimancode padinjarekkara ela road side wall
Read moreAnnual plan 2023-24 pmla 151
Annual plan 2023-24 pmla 151 meeranvetty chathimangalam road concreting in peringammala gp
Read moreof your Industry type