Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Expansion Joints
|
| Description |
Supply Of Expansion Joints As Per Tender Technical Specifications
|
| Organisation | IndianOil Corporation Limited(IOCL) |
| Tender Id | 2023_HR_169080_1 |
|
Reference Number |
RHM23R1029 |
| Tender Fee | - |
| EMD | 0 |
| Tender Value | - |
| Place | HALDIA |
| Link |
View Original Tender Notice
https://iocletenders.nic.in |
| Start Date | July 28, 2023 18:35 |
| End Date |
Expired
31/08/2023
Expired 1137 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreExpansion of academic section 2 at 2nd floor of old opd block, nims
Expansion of academic section 2 at 2nd floor of old opd block, nims
Read moreExpansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Read moreProviding barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type