Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Monthly Basis Cab & Taxi Hiring Services Suv; 4000 Km X 364 Hrs; Local,Monthly Basis Cab & Taxi H
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2023/B/4033863 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | October 03, 2023 18:10 |
| End Date |
Expired
18/10/2023
Expired 1088 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | Status |
|---|---|---|---|---|
| 1 | ABEONA TRANSPORT AGENCY | 18-10-2023 01:12:19 | Registered with designated Agency / Authority | Disqualified |
| 2 | BABA HARDEV TRAVEL | 18-10-2023 13:37:15 | Central / State PSUs | Disqualified |
| 3 | DWIVEDI ENTERPRISES | 07-10-2023 12:17:43 | MSE | Qualified |
| 4 | M/S VAIBHAV ASSOCIATES | 13-10-2023 12:25:06 | Registered with designated Agency / Authority | Qualified |
| 5 | OM TOURS | 18-10-2023 17:44:44 | Registered with designated Agency / Authority | Qualified |
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type