Tender Details
Particulars | Details |
---|---|
Title |
Additional Electric Work At Re Setting Up Of Control Room For Child/Women Help Line, 6th Floor, Isbt Building, Kashmere Gate Delhi
|
Description |
Additional Electric Work At Re Setting Up Of Control Room For Child/Women Help Line, 6th Floor, Isbt Building, Kashmere Gate Delhi
|
Organisation | Government of NCT of Delhi |
Tender Id | 2023_DTIDC_247149_1 |
Reference Number |
59/2023-24 |
Tender Fee | 0 |
EMD | 12375 |
Tender Value | |
Place | DTIDC Ltd. 2nd floor ISBT Kashmere Gate Delhi |
Link | https://govtprocurement.delhi.gov.in |
Start Date | September 04, 2023 23:40 |
End Date |
12/09/2023 ( Expired 634 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Read moreLicensing of developed furnished shop no. b (back side) of static old bus at isbt kashmere gate, delhi, for commercial utilization, as detailed in annexure-1
Licensing of developed furnished shop no. b (back side) of static old bus at isbt kashmere gate, delhi, for commercial utilization, as detailed in annexure-1
Read moreMaintenance work of ot complex 5th and 6th floor in ipd building at aiims patna
Maintenance work of ot complex 5th and 6th floor in ipd building at aiims patna
Read moreSpl repair replacement of street light pole including necessary items ug cables fp panel at mh danapur and provn of electric connection for ups room along with connected work at cda patna under ge danapur
Spl repair replacement of street light pole including necessary items ug cables fp panel at mh danapur and provn of electric connection for ups room along with connected work at cda patna under ge danapur
Read moreConstruction of building for kendriya vidyalaya no 04 09 staff quarters and boudary wall at kandhar lines delhi cantt deposit work
Construction of building for kendriya vidyalaya no 04 09 staff quarters and boudary wall at kandhar lines delhi cantt deposit work
Read moreWork of appointment of service provider for providing complete managed sdwan services with ip mpls vpn and internet lease line connectivity at all locations of ged and setting up of onsite network operation centre for the period of 3 yrs
Work of appointment of service provider for providing complete managed sdwan services with ip mpls vpn and internet lease line connectivity at all locations of ged and setting up of onsite network operation centre for the period of 3 yrs
Read moreNational ayush mission construction of additional building for govt homoeopathy dispensary at sulthan batheri, wayanad civil and electrical work
National ayush mission construction of additional building for govt homoeopathy dispensary at sulthan batheri, wayanad civil and electrical work
Read moreCompletion of incomplete work for provn of qty -2 prefab shelter with attached toilets for smc and provn of separate infrastructure for women officers (flying branch) and provn of toilet and bathroom at dolma gate sub guard room, rp gate and near h
Completion of incomplete work for provn of qty -2 prefab shelter with attached toilets for smc and provn of separate infrastructure for women officers (flying branch) and provn of toilet and bathroom at dolma gate sub guard room, rp gate and near h
Read moreConstruction of silachari block public health unit (bphu) at silachari phc under 15th fc during 2024-25/s.h- building portion in/c sanitary installation, water supply arrangement and setting up basic civil requirements for lab unit.
Construction of silachari block public health unit (bphu) at silachari phc under 15th fc during 2024-25/s.h- building portion in/c sanitary installation, water supply arrangement and setting up basic civil requirements for lab unit.
Read moreConstruction of multistoried academic building at beltola college campus (phase-iii) (remaining work of class room (first floor ) building at beltola college, beltola, ghy-29
Construction of multistoried academic building at beltola college campus (phase-iii) (remaining work of class room (first floor ) building at beltola college, beltola, ghy-29
Read moreof your Industry type