Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Re Sinking Of 15 Nos 100 Mm Dia Permanent Hydrograph Station In Purba Burdwan Dist
|
Description |
Re Sinking Of 15 Nos 100 Mm Dia Permanent Hydrograph Station At Different Blocks In The District Of Purba Burdwan
|
Organisation | Government of West Bengal |
Tender Id | 2023_SWID_548837_1 |
Reference Number |
09/2023-24 of EE/SWID-II BDN |
Tender Fee | |
EMD | 36100 |
Tender Value | |
Place | PURBA BURDWAN |
Link | https://wbtenders.gov.in |
Start Date | July 21, 2023 17:00 |
End Date |
05/08/2023 ( Expired 701 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Surf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Read moreProviding, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule)
Providing, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule) &#x0d &#x0d
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstruction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Read moreMaintenance of 3 nos. 100 mw hydro generator units of chamera ii power station karian distt. chamba h.p for two years i.e. 2025-26 to 2026-27
Maintenance of 3 nos. 100 mw hydro generator units of chamera ii power station karian distt. chamba h.p for two years i.e. 2025-26 to 2026-27
Read moreSupply replacement testing and commissioning of 10000 nos of 1200 mm sweep 5-star rated 28w bldc fans in the government buildings of lakshadweep islands and buying back the replaced old fans for disposal
Supply replacement testing and commissioning of 10000 nos of 1200 mm sweep 5-star rated 28w bldc fans in the government buildings of lakshadweep islands and buying back the replaced old fans for disposal
Read moreReplacement of old and damaged 300 mm dia sewer line in block no. 11 in ward no.195 kalyanpuri in ac-56 under ee(d)-012.
Replacement of old and damaged 300 mm dia sewer line in block no. 11 in ward no.195 kalyanpuri in ac-56 under ee(d)-012.
Read moreRunning and maintenance of existing 02 nos over head steel press tank inside police line tank compound by dismantling and re-crecting the tank in the existing location, 01 no over head steel pressed tank at sainik vishram ghar,near.........
Running and maintenance of existing 02 nos over head steel press tank inside police line tank compound by dismantling and re-crecting the tank in the existing location, 01 no over head steel pressed tank at sainik vishram ghar,near.........
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreKtps-vii stage- adm-ss-gs-rewiring ad replacement of spares 05 nos 100 kva and 01 no 250kva aluminum winding distribution transformer in general services sub division of ss division of ktps-vii stage
Ktps-vii stage- adm-ss-gs-rewiring ad replacement of spares 05 nos 100 kva and 01 no 250kva aluminum winding distribution transformer in general services sub division of ss division of ktps-vii stage
Read moreof your Industry type