Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Fixing Of New Led Street Lights In The Area Of Vidhyut Samiti B At Nagar Nigam Jaipur Heritage
|
Description |
Providing And Fixing Of New Led Street Lights In The Area Of Vidhyut Samiti B At Nagar Nigam Jaipur Heritage
|
Organisation | DLB | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3270 |
EMD | 1.88 Lakh |
Tender Value | |
Place | JAIPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | June 27, 2025 23:30 |
End Date |
12/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreSupply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreFixing work of childrens swings, benches and dustbins inside the boundary wall of parks built in wards 01,03,11,26,32 and 36 under the municipal area. (as per attached specification)
Fixing work of childrens swings, benches and dustbins inside the boundary wall of parks built in wards 01,03,11,26,32 and 36 under the municipal area. (as per attached specification)
Read moreProviding and installation of water chiller and 500 ltr per hour reverse omsosis at making 12x10 room for cold water drinking water at gandhi market nagar nigam gwalior file no. 204/25x9/1
Providing and installation of water chiller and 500 ltr per hour reverse omsosis at making 12x10 room for cold water drinking water at gandhi market nagar nigam gwalior file no. 204/25x9/1
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreCertain repair to pcc flooring, diaphragm walls, structural members, drains, misc b/r wks, repair maint of fire fighting and w/s pipelines and connected accessories in sea shore area dnpm office, boat pool and various bldgs of amn jetty at ns karanja
Certain repair to pcc flooring, diaphragm walls, structural members, drains, misc b/r wks, repair maint of fire fighting and w/s pipelines and connected accessories in sea shore area dnpm office, boat pool and various bldgs of amn jetty at ns karanja
Read moreof your Industry type