Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of Cc Tiles Track On Both Sides Of The Road On Road No 09 In Parsakheda Industrial Area
|
| Description |
Construction Work Of Cc Tiles Track On Both Sides Of The Road On Road No 09 In Parsakheda Industrial Area
|
| Organisation | Directorate of Local Bos UP | State Govt. and UT |
| Tender Id | 2024_DOLBU_885877_1 |
|
Reference Number |
579 (1to20)22 /C.E/NNB/2023-24 S.No 5 |
| Tender Fee | 2006 |
| EMD | 33813 |
| Tender Value | |
| Place | Nagar Nigam Bareilly |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1518357 |
| Start Date | January 27, 2024 19:30 |
| End Date |
Expired
30/01/2024
Expired 880 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
O and m of facilities amenities (kiosk only) at maroud toll plaza (km. 45.500) on both sides (lhs-rhs) under highway nest (mini) on kodebod- dhamtari section of nh-30 in the state of chhattisgarh under the jurisdiction of piu -abhanpur
O and m of facilities amenities (kiosk only) at maroud toll plaza (km. 45.500) on both sides (lhs-rhs) under highway nest (mini) on kodebod- dhamtari section of nh-30 in the state of chhattisgarh under the jurisdiction of piu -abhanpur
Read moreWidening and strengthening work of bassi to industrial area toonga road
Widening and strengthening work of bassi to industrial area toonga road
Read moreConstruction of nala and cc road on morra road
Construction of nala and cc road on morra road
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read morePl bm pc and upgradation of roads with interlocking tiles on berms in ward no 1 to 13
Pl bm pc and upgradation of roads with interlocking tiles on berms in ward no 1 to 13
Read moreConstruction of cc road and other work in village atari and alipur under gram panchayat atari.
Construction of cc road and other work in village atari and alipur under gram panchayat atari.
Read moreConstruction of drain work at barod town on state highway-70 (bot road) sh
Construction of drain work at barod town on state highway-70 (bot road) sh
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreFabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Fabrication and repairing of 150 hp direct haulage for smooth and safe haulage operation at pit no. 09 in madhaipur colliery under pandaveswar area.
Read moreUnder district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7
Under district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7&#x0d
Read moreof your Industry type