Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal Of Lalbojha Bhawaniyapur Road To Pipraghat Link Road Km 1(600) Year 2024 25 In District Shravasti.
|
| Description |
Renewal Of Lalbojha Bhawaniyapur Road To Pipraghat Link Road Km 1(600) Year 2024 25 In District Shravasti. &Amp#X0d
|
| Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
| Tender Id | 2025_CEDPW_1007013_2 |
|
Reference Number |
464/e-Tender/2024-25 Date 07-02-2025 |
| Tender Fee | 945 |
| EMD | 83000 |
| Tender Value | |
| Place | Shravasti |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1803557 |
| Start Date | February 15, 2025 23:30 |
| End Date |
Expired
25/02/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreStrengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Read moreUnder district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3
Under district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3&#x0d
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreUnder district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1
Under district sultanpur, construction of interlocking road from the house of shri ramtej prajapati to the paved road in village lohar west, lot no 1&#x0d
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreof your Industry type