Tender Details
Particulars | Details |
---|---|
Title |
Balance Work For The Construction Of Protection Work Near Pump Room And Gsr Under Wss Dodasan Remote (Jjm).
|
Description |
Balance Work For The Construction Of Protection Work Near Pump Room And Gsr Under Wss Dodasan Remote (Jjm).
|
Organisation | PHE | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 9340 |
Tender Value | |
Place | RAJOURI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 05, 2025 23:30 |
End Date |
13/05/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Read moreConstruction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Construction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Read moreRequest for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/contractor under regional office,odisha
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/contractor under regional office,odisha
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maintenance for 05 years for mrs campus on turnkey basis
Read moreof your Industry type