Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work For Construction Of Protection Work At 02 No. Borewell Site Under Wss Khodmong (Jjm).
|
| Description |
Balance Work For Construction Of Protection Work At 02 No. Borewell Site Under Wss Khodmong (Jjm).
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2025_PHE_296686_1 |
|
Reference Number |
e-NIT No. 14 of 2025-26 dated 28-11-2025 |
| Tender Fee | 1000 |
| EMD | 11820 |
| Tender Value | - |
| Place | RAJOURI |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=961374 |
| Start Date | November 28, 2025 23:30 |
| End Date |
Expired
04/12/2025
Expired 315 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Jjm-wss to vengoor, asamannoor and mudakuzha panchayath-package ii-construction of 10 mld capacity water treatment plant at chooramudy (balance works)-general civil work
Construction of 10 mld capacity water treatment plant at chooramudy (balance works)-general civil work
Read moreUrgent electrical and mechanical works to be carried out at wss kanispora raw water under jjm
Urgent electrical and mechanical works to be carried out at wss kanispora raw water under jjm
Read moreAugmentation of wss tangnar from 10 mgd to 12.5 mgd balance works by way of sitc of pumping units and allied works at wss tangnar stage 1st and 2nd.
Augmentation of wss tangnar from 10 mgd to 12.5 mgd balance works by way of sitc of pumping units and allied works at wss tangnar stage 1st and 2nd.
Read moreConstruction of approach road and protection wall to material recovery facility ( mrf) site at sui udhampur
Construction of approach road and protection wall to material recovery facility ( mrf) site at sui udhampur
Read moreJjm - wss to mattathur, varandharappilly, kodakara (part 2) , alagappanagar (part) in thrissur district- renovation of existing ohsr at mattathurkunnu- general civil work
Jjm - wss to mattathur, varandharappilly, kodakara (part 2) alagappanagar (part) in thrissur district- renovation of existing ohsr at mattathurkunnu- general civil work
Read moreAnnual plan-467/27-karikkulam side protection wall and road renovation balance portion ward -22-general civil work
Side protection and side concrete
Read moreJal jeevan mission (jjm) - phase ii-wss to mallapally,anicad and kottangal panchayath- construction of 3mld wtp plant in malampara scheme (kottangal panchayath)
Jal jeevan mission (jjm) - phase ii-wss to mallapally,anicad and kottangal panchayath- construction of 3mld wtp plant in malampara scheme (kottangal panchayath)
Read moreElectrical and mechanical works to be carried out at wss green colony wuyan of jal shakti (phe) mechanical division south awantipora under jjm.
Electrical and mechanical works to be carried out at wss green colony wuyan of jal shakti (phe) mechanical division south awantipora under jjm.
Read moreBalance work of conversion of p t to piped water supply scheme of rwss sodhwali on the risk and cost under jjm
Balance work of conversion of p t to piped water supply scheme of rwss sodhwali on the risk and cost under jjm
Read moreSurvey and site prep,drilling of 165 mm dia borewell upto 150 mtr depth,supply and installation of 165 mm dia heavy duty upvc casing pipe,supply and installation of 150 mm dia slotted pipe,civil works concrete platform soak pit,borewell development using air compressor,contingency
Survey and site prep,drilling of 165 mm dia borewell upto 150 mtr depth,supply and installation of 165 mm dia heavy duty upvc casing pipe,supply and installation of 150 mm dia slotted pipe,civil works concrete platform soak pit,borewell development using air compressor,contingency
Read moreof your Industry type