Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work For The Construction Of Protection Work Near Pump Room And Gsr Under Wss Ujhan A (Jjm).
|
| Description |
Balance Work For The Construction Of Protection Work Near Pump Room And Gsr Under Wss Ujhan A (Jjm).
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2025_PHE_286640_1 |
|
Reference Number |
e-NIT No. 10 of 2025-26 dated 02-09-2025 |
| Tender Fee | 1000 |
| EMD | 14680 |
| Tender Value | - |
| Place | Rajouri |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=898300 |
| Start Date | September 02, 2025 23:30 |
| End Date |
Expired
09/09/2025
Expired 403 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Permanent restoration of road from ujhan dhaki to ujhan bridge
Permanent restoration of road from ujhan dhaki to ujhan bridge
Read moreJjm-wss to vengoor, asamannoor and mudakuzha panchayath-package ii-construction of 10 mld capacity water treatment plant at chooramudy (balance works)-general civil work
Construction of 10 mld capacity water treatment plant at chooramudy (balance works)-general civil work
Read moreJaljeevan mission jjm parassala grama panchayath suppling and laying distribution system balance work
Jaljeevan mission jjm parassala grama panchayath suppling and laying distribution system balance work
Read moreUrgent electrical and mechanical works to be carried out at wss kanispora raw water under jjm
Urgent electrical and mechanical works to be carried out at wss kanispora raw water under jjm
Read moreProviding lowering, laying and jointing pipelines at bagde gsr
Providing lowering, laying and jointing pipelines at bagde gsr zone for filling the gaps of hdpe pipelines and commissioning of water supply scheme phase-ii for ahilyanagar municipal corporation ahilyanagar
Read moreAugmentation of wss tangnar from 10 mgd to 12.5 mgd balance works by way of sitc of pumping units and allied works at wss tangnar stage 1st and 2nd.
Augmentation of wss tangnar from 10 mgd to 12.5 mgd balance works by way of sitc of pumping units and allied works at wss tangnar stage 1st and 2nd.
Read moreJjm - wss to mattathur, varandharappilly, kodakara (part 2) , alagappanagar (part) in thrissur district- renovation of existing ohsr at mattathurkunnu- general civil work
Jjm - wss to mattathur, varandharappilly, kodakara (part 2) alagappanagar (part) in thrissur district- renovation of existing ohsr at mattathurkunnu- general civil work
Read moreRr damages of providing wss karsog town and its adjoing area wss bahanu wss bagaila
Rr damages of providing wss karsog town and its adjoing area wss bahanu wss bagaila
Read moreAnnual plan-467/27-karikkulam side protection wall and road renovation balance portion ward -22-general civil work
Side protection and side concrete
Read moreJal jeevan mission (jjm) - phase ii-wss to mallapally,anicad and kottangal panchayath- construction of 3mld wtp plant in malampara scheme (kottangal panchayath)
Jal jeevan mission (jjm) - phase ii-wss to mallapally,anicad and kottangal panchayath- construction of 3mld wtp plant in malampara scheme (kottangal panchayath)
Read moreof your Industry type