About Tender
🌱 Procurement Opportunity: Co2 Purification & Dry Ice Production Plant 🌱 The Ministry Of Power, Through Its Entity, Ntpc Vindhyachal, Is Seeking Bids For The Supply, Installation, And Commissioning Of A Co2 Purification, Bottling, And Dry Ice Production Plant With A Capacity Of 100 Kg/Hr. 🏭 🗓️ Deadline: April 8, 2024, 1:00 Pm Bidders Must Demonstrate Expertise In The Field Of Gas Purification And Production, With A Focus On Co2. Detailed Technical And Financial Bids Are Required, Along With A Clear Project Execution Plan. Keywords: Co2 Purification, Dry Ice Production, Ntpc Vindhyachal, Ministry Of Power, Procurement, Industrial Equipment| Particulars | Details |
|---|---|
| Title |
Supply Of 100 Kg/Hr Co2 Purification, Bottling & Dry Ice Production Plant At Ntpc Vindhyachal
|
| Description |
|
| Organisation | NA | Ministry of Power |
| Tender Id | GEM/2024/B/4752706 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 08, 2024 17:34 |
| End Date |
Expired
08/04/2024
Expired 789 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | BOSCO INDIA | Make : BOSCO INDIA Model : Supply Of 100 Kg/hr CO2 Purification Title : Supply of 100 kg/hr CO2 purification, bottling & Dry Ice production plant at NTPC Vindhyachal | 05-04-2024 13:11:15 | Registered with designated Agency / Authority | MII MSE | Disqualified |
| 2 | HYPRO ENGINEERS PRIVATE LIMITED | Make : HYPRO Model : Hypro CO2 Recovery and Purification System Title : 100 kg/hr CO2 purification, bottling & Dry Ice | 17-04-2024 12:44:49 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | M/S MOS TECHNO ENGINEERS | Make : M/S MOS TECHNO ENGINEERS Model : Supply of 100 kg/hr CO2 purification, bottling & D Title : Supply of 100 kg/hr CO2 purification, bottling & Dry Ice production plant at NTPC Vindhyachal (Q3) | 16-04-2024 17:03:51 | Offline upload | MII | Qualified |
Conclusion of contract for supply of veg fresh and ice (machine made) at supply depot asc patiala for the period from 01 oct 2026 to 30 sep 2027
Conclusion of contract for supply of veg fresh and ice (machine made) at supply depot asc patiala for the period from 01 oct 2026 to 30 sep 2027
Read moreSupply and erection of precast bus shelter near at mettur main road in ward no 100 south zone
Supply and erection of precast bus shelter near at mettur main road in ward no 100 south zone &#x0d
Read moreDesign, supply, installation and commissioning of 15kwp grid connected spv power plant at kooroppada grama panchayat, kottayam district.
Design, supply, installation and commissioning of 15kwp grid connected spv power plant at kooroppada grama panchayat, kottayam district.
Read moreSupply of heavy-duty pillar type drilling machine on door delivery basis at hbl plant sugauli, east champaran, bihar
Supply of heavy-duty pillar type drilling machine on door delivery basis at hbl plant sugauli, east champaran, bihar
Read moreDesign, supply, installation, testing and commissioning of panel interlocking based signalling system in connection with development of 3rd silo loading arrangement at lalmatia loading yard of ntpc limited.
Design, supply, installation, testing and commissioning of panel interlocking based signalling system in connection with development of 3rd silo loading arrangement at lalmatia loading yard of ntpc limited.
Read moreSupply of rice bran, rice bran extraction, mustard extraction, maize, ddgs grade-i and ddgs grade-ii at kapurthala and gidderbaha plant
Supply of rice bran, rice bran extraction, mustard extraction, maize, ddgs grade-i and ddgs grade-ii at kapurthala and gidderbaha plant
Read moreSelection of agency for supply, installation, testing and commissioning of 60tpd coconut disposal waste processing plant on ppp basis at devguradiya, indore (madhya pradesh) for 07 years
Selection of agency for supply, installation, testing and commissioning of 60tpd coconut disposal waste processing plant on ppp basis at devguradiya, indore (madhya pradesh) for 07 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years
Survey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years at krushibeej farmer producer company ltt
Read moreState plan-2024-25-arwss to erattayar - supply, insatallation and commissioning of 20 hp automatic star delta starter at erattayar plant for nanguthotty pumping-general civil work
State plan-2024-25-arwss to erattayar -&#x0d supply, insatallation and commissioning of 20&#x0d hp automatic star delta starter at erattayar&#x0d plant for nanguthotty pumping-general civil&#x0d work
Read moreof your Industry type