Tender Details

Particulars Details
Title
Replacement Work Of 26 Mm Steel Wire Rope At Shahadara Drain In New Delhi.
Description
Replacement Work Of 26 Mm Steel Wire Rope At Shahadara Drain In New Delhi.
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2025_UPIDM_996421_1
Reference
Number
20/EE/CSD-3/2024-25/LOT-3
Tender Fee 854
EMD 61000
Tender Value
Place ashok nagar, new delhi
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1766733
Start Date January 22, 2025 20:30
End Date

07/02/2025 ( Expired 143 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur

Selection of concessionaire for ther work of development of municipal solid waste processing facility in design built finance and operate on royalty basis and transfer (on ppp model) which include waste to bio-gas plant and mrf facility at kedarpur

Read more
Construction of c.c. road and drain work at sultan sing house to kuar baba mandir tak village nainagir zone 22.ward no.61 file no.91/25x3/6.

Construction of c.c. road and drain work at sultan sing house to kuar baba mandir tak village nainagir zone 22.ward no.61 file no.91/25x3/6.

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise