| Particulars | Details |
|---|---|
| Title |
Contract For Shifting Of Tanks, Laying Of Hose Pipes Mixing Of Chemical For Carrying Out Hydro Test Of Main Fractionator Column At Hrrl Barmer Site
|
| Description |
Contract For Shifting Of Tanks, Laying Of Hose Pipes Mixing Of Chemical For Carrying Out Hydro Test Of Main Fractionator Column At Hrrl Barmer Site
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2024_BHEL_33256_1 |
|
Reference Number |
OS/SC/2023-24/142/85/RP |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | HRRL-BARMER SITE |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=34774 |
| Start Date | February 21, 2024 21:30 |
| End Date |
Expired
24/02/2024
Expired 963 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Contract for shifting of tanks, laying of hose pipes mixing of chemical for carrying out hydro test of main fractionator column at hrrl-barmer site
Contract for shifting of tanks, laying of hose pipes mixing of chemical for carrying out
 hydro test of main fractionator column at hrrl-barmer site
Read moreContract for shifting of tanks, laying of hose pipes mixing of chemical for carrying out hydro test of main fractionator column at hrrl-barmer site
Contract for shifting of tanks, laying of hose pipes mixing of chemical for carrying out
 hydro test of main fractionator column at hrrl-barmer site
Read moreContract for erection and commissioning of internals of main fractionator column at hrrl barmer site so no 2439
Contract for erection and commissioning of internals of main fractionator column at hrrl barmer site so no 2439
Read moreWorks contract for engaging an agency for carrying out welding activities of deaerator storage tanks, heaters, air receivers, ammonia tanks, plate formed pipes at production shop of bhel-hpvp, visakhapatnam
Works contract for engaging an agency for carrying out welding activities of deaerator storage tanks, heaters, air receivers, ammonia tanks, plate formed pipes at production shop of bhel-hpvp, visakhapatnam
Read moreEngagement of agency for supply installation commissioning of hollow metallic sensor tube base linear heat detector for class a1 hydrocarbon storage tanks complete in all respect as per specification for hrrl tank site pkg 05 /6b barmer rajasthan
Engagement of agency for supply installation commissioning of hollow metallic sensor tube base linear heat detector for class a1 hydrocarbon storage tanks complete in all respect as per specification for hrrl tank site pkg 05 /6b barmer rajasthan
Read moreEngagement of agency for carrying out insulations works on pipes, equipments and tanks along with supply of material for our epcc contract-bitumen plant of m/s hpcl, visakh refinery, visakhapatnam
Engagement of agency for carrying out insulations works on pipes, equipments and tanks along with supply of material for our epcc contract-bitumen plant of m/s hpcl, visakh refinery, visakhapatnam
Read moreRepair/maint of borewell, replacement of u/s column pipes of borewells, repair/rewinding submersible motors, pump sets, repair /replacement of starters, panels, cleaning of ug sumps, overhead tanks and other connected misc e/m works at base hospital
Repair/maint of borewell, replacement of u/s column pipes of borewells, repair/rewinding submersible motors, pump sets, repair /replacement of starters, panels, cleaning of ug sumps, overhead tanks and other connected misc e/m works at base hospital
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreof your Industry type