Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road Of 4m Wide Between Metro Median And Existing Nhai Main Carriageway Along Hosur Main Road Between Bommasandra And Central Silk Board In Stretches Between Metro Piers,Rp616 To Rp207 For A Length Of 5.244 Km Of R5 Line Of Bmrcl,Ph 2
|
Description |
Construction Of Road Of 4m Wide Between Metro Median And Existing Nhai Main Carriageway Along Hosur Main Road Between Bommasandra And Central Silk Board In Stretches Between Metro Piers,Rp616 To Rp207 For A Length Of 5.244 Km Of R5 Line Of Bmrcl,Ph 2
|
Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
Tender Id | 2025_BMRCL_231184_1 |
Reference Number |
BMRCL/Ph-2/R5/RW/2025/128 |
Tender Fee | 59000 |
EMD | 15 Lakh |
Tender Value | |
Place | Bangalore |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=260871 |
Start Date | April 03, 2025 15:30 |
End Date |
09/04/2025 ( Expired 12 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Read moreGuarding- 76 spans (60 mtr span avg. length) in existing 33 kv overhead line laid in between 33 kv main substation, bhatgaon sub area and 33 kv substation, kalyani sub area n heightening along with guarding of section with 18 spans of 3.3 kv oh fee
Guarding- 76 spans (60 mtr span avg. length) in existing 33 kv overhead line laid in between 33 kv main substation, bhatgaon sub area and 33 kv substation, kalyani sub area n heightening along with guarding of section with 18 spans of 3.3 kv oh fee
Read moreConsultancy services for instrumentation and structural health monitoring of pier segments of 03 retrofitted spans of road flyover of metro cum road bridge between rv road to central silk board metro station in r5(p3) line of bmrcl project,phase-2.
Consultancy services for instrumentation and structural health monitoring of pier segments of 03 retrofitted spans of road flyover of metro cum road bridge between rv road to central silk board metro station in r5(p3) line of bmrcl project,phase-2.
Read moreConstruction of road (main carriageway) in 4th lane of nh road in between bommasandra and kudlugate
Construction of road (main carriageway) in 4th lane of nh road in between bommasandra and kudlugate along bangalore - hosur highway (reach-5 of package-2, approximately 4.00 km length) of bangalore metro rail project, phase-2.
Read moreFinal location survey for 3rd line between guwahati-lumding (app. length =181.00 km) with geo-technical investigation, preparing eirr & submission of dpr as per railway board s latest guide lines complete in all respect.
For complete deion and other details, please refer to tender
Read moreFinal location survey (fls) for 3rd/4t line on hdn route between new jalpaiguri-kamakhya section (app. length = 421.45 km) with geo-technical investigation, preparing eirr & submission of dpr as per railway board s latest guide lines complete in all respect.
For complete deion and other details, please refer to tender
Read moreMaintenance of 33 kv ohtl of mines and chp feeder, erection of damaged cradle guards sky wire of route length 12.1 km 4.2 km respectively between switching substation and 4211 substation along with heightening of road crossing span of mine feeder.
Maintenance of 33 kv ohtl of mines and chp feeder, erection of damaged cradle guards sky wire of route length 12.1 km 4.2 km respectively between switching substation and 4211 substation along with heightening of road crossing span of mine feeder.
Read moreWork of road safety improvement by means of widening of existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 borbhatha ankleshwar section under road safety annual plan 2023-24 total length 4.4km
Work of road safety improvement by means of widening of existing carriageway from 3.0mt to 5.50mt between
 km 234/00 to 238/400 borbhatha ankleshwar section under road safety annual plan 2023-24 total length 4.4km
Read moreWork of road safety improvement by means of widening of existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 borbhatha ankleshwar section under road safety annual plan 2023-24 total length 4.4km
Work of road safety improvement by means of widening of existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 borbhatha ankleshwar section under road safety annual plan 2023-24 total length 4.4km
Read moreWork of road safety improvement by means of widening of existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 borbhatha ankleshwar section under road safety annual plan 2023-24 total length 4.4km
Work of road safety improvement by means of widening of existing carriageway from 3.0mt to 5.50mt between km 234/00 to 238/400 borbhatha ankleshwar section under road safety annual plan 2023-24 total length 4.4km
Read moreof your Industry type