Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Construction Of Nh Road 🛣️ Bangalore Metro Rail Corporation Limited (Bmrcl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of The Main Carriageway In The 4th Lane Of Nh Road, Spanning Approximately 4.00 Km Between Bommasandra And Kudlugate On The Bangalore Hosur Highway. This Project Is Part Of The Bangalore Metro Rail Project, Phase 2 (Reach 5 Of Package 2). 📅 Bid Submission Deadline: August 12, 2024, 3:00 Pm Tender Fee: Inr 11,800 Earnest Money Deposit (Emd): Inr 9,66,000 Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, Adhering To The Project Specifications And Timelines. Keywords: Construction, Road, Nh, Bangalore Hosur Highway, Bmrcl, Bangalore Metro Rail Project, Phase 2, Government Tender, Bid, Emd| Particulars | Details |
|---|---|
| Title |
Construction Of Road (Main Carriageway) In 4th Lane Of Nh Road In Between Bommasandra And Kudlugate
|
| Description |
Construction Of Road (Main Carriageway) In 4th Lane Of Nh Road In Between Bommasandra And Kudlugate Along Bangalore Hosur Highway (Reach 5 Of Package 2, Approximately 4.00 Km Length) Of Bangalore Metro Rail Project, Phase 2.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_BMRCL_200143_1 |
|
Reference Number |
BMRCL/Ph-2/R5(P1P2)/Road Work/2024/110 |
| Tender Fee | 11800 |
| EMD | 9.66 Lakh |
| Tender Value | - |
| Place | Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=219090 |
| Start Date | August 05, 2024 15:30 |
| End Date |
Expired
12/08/2024
Expired 795 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreMacadamization of inner link road nh no. 308 lane n shahanwar colony.
Macadamization of inner link road nh no. 308 lane n shahanwar colony.
Read moreSpecial repair (sr) work over the damage surface in stretches between km 317.00 to km 320.00 of nh-14 (nh-60)
Special repair (sr) work over the damage surface in stretches between km 317.00 to km 320.00 of nh-14.
Read moreUpgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Read moreStrengthening of existing carriageway and curve improvement from km. 84_00 to km. 97_00 of nh 748 in the state of goa on epc mode
Strengthening of existing carriageway and curve improvement from km. 84_00 to km. 97_00 of nh 748 in the state of goa on epc mode
Read moreUpgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
Upgradation from 2-lane ps to 4-lane ps of bagdogra panitanki kharibari galgalia section of nh-327 in the state of west bengal on ham mode under nh(o)
Read moreUpgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreLand acquisition process for the proposed provision of the 4th railway line between asangaon-kasara 34.97km) (one packet system).
Land acquisition process for the proposed provision of the 4th railway line between asangaon-kasara 34.97km) (one packet system).
Read moreof your Industry type