Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Civil And Structural Works Including Architectural Finishes For Travellator And Connecting Walkway Between Reach 5/Phase 2/Yellow Line Central Silk Board Station To Blue Line Orr Central Silk Board Station Of Bangalore Metro Rail Project, Phase 2 A.
|
| Description |
Civil And Structural Works Including Architectural Finishes For Travellator And Connecting Walkway Between Reach 5/Phase 2/Yellow Line
Central Silk Board Station To Blue Line Orr Central Silk Board Station Of Bangalore Metro Rail Project, Phase 2 A.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2026_BMRCL_273940_1 |
|
Reference Number |
BMRCL/TrvR5Ph2A/P1CSB/2026/146 |
| Tender Fee | 59000 |
| EMD | 58.99 Lakh |
| Tender Value | - |
| Place | Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319827 |
| Start Date | April 28, 2026 15:30 |
| End Date |
Expired
04/05/2026
Expired 167 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Manufacturing, supply and laying of rcc cable trough for orr, airport line (new line) of phase-2a and phase-2b and depot entry portion of r-4 and r-2 extensions.
Manufacturing, supply and laying of rcc cable trough for orr, airport line (new line) of phase-2a and phase-2b and depot entry portion of r-4 and r-2 extensions.
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreIndependent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Independent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Read moreManufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Manufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Read moreFabrication and installation of median safety grills in reach-6 of bangalore metro rail project, phase-2.
Fabrication and installation of median safety grills in reach-6 of
 bangalore metro rail project, phase-2.
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package b
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreConsultancy services for green building certification of 13 elevated metro stations in package 1 and 2 of phase 2a corridor of bangalore metro under igbc mrts rating.
Consultancy services for green building
 certification of 13 elevated metro stations in package 1 and 2 of phase 2a
 corridor of bangalore metro under igbc mrts rating.
Read moreConstruction of army quarters at marshal barrack campus and baird barrack campus, construction of storage (luggage facility) at rsaoi and construction of guard rest room at ibbalur army camp in bangalore, bangalore metro rail project-phase-2a.
Construction of army quarters at marshal barrack campus and baird barrack campus, construction of storage (luggage facility) at rsaoi and construction of guard rest room at ibbalur army camp in bangalore, bangalore metro 
 rail project-phase-2a.
Read moreDesign, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works
Design, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works
Read moreof your Industry type