Consultancy Services For Green Building Certification Of 13 Elevated Metro Stations In Package 1 And 2 Of Phase 2 A Corridor Of Bangalore Metro Under Igbc Mrts Rating.
Description
Consultancy Services For Green Building&#X0d Certification Of 13 Elevated Metro Stations In Package 1 And 2 Of Phase 2 A&#X0d Corridor Of Bangalore Metro Under Igbc Mrts Rating.
Organisation Bangalore Metro Rail Corporation Limited | Public Sector Undertakings
Tender Id 2025_BMRCL_239951_1
Reference
Number
BMRCL/Ph-2A/Consl.Service/133
Tender Fee 11800
EMD 21300
Tender Value -
Place Bangalore
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=273049

Start Date July 10, 2025 15:30
End Date
Expired 15/07/2025

Expired 459 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Lkgc (02)-01 general consultancy services for lucknow mrts project phase 1b

Lkgc 02 01 general consultancy services for lucknow mrts project phase 1b

Read more
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Read more
Design, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.

Design, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.

Read more
Shortlisting of general consultants for corridor-1 and 2 of phase-3 of bangalore metro rail project.

Shortlisting of general consultants for corridor-1 and 2 of phase-3 of bangalore metro rail project.

Read more
Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.

Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.

Read more
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.

Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.

Read more
Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.

Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.

Read more
Contract package-p3- partial and full demolition/dismantling of buildings/structures identified from sumanahalli station (excl) to kempapura station (excl) (from ch. 17.695 km to ch. 30.866 km) in corridor-1of bangalore metro rail project phase-3.

Contract package-p3- partial and full demolition/dismantling of buildings/structures identified from sumanahalli station (excl) to kempapura station (excl) (from ch. 17.695 km to ch. 30.866 km) in corridor-1of bangalore metro rail project phase-3.

Read more
Contract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.

Contract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.

Read more