Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Green Building Certification Of 13 Elevated Metro Stations In Package 1 And 2 Of Phase 2 A Corridor Of Bangalore Metro Under Igbc Mrts Rating.
|
| Description |
Consultancy Services For Green Building
Certification Of 13 Elevated Metro Stations In Package 1 And 2 Of Phase 2 A
Corridor Of Bangalore Metro Under Igbc Mrts Rating.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2025_BMRCL_239951_1 |
|
Reference Number |
BMRCL/Ph-2A/Consl.Service/133 |
| Tender Fee | 11800 |
| EMD | 21300 |
| Tender Value | - |
| Place | Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=273049 |
| Start Date | July 10, 2025 15:30 |
| End Date |
Expired
15/07/2025
Expired 459 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreLkgc (02)-01 general consultancy services for lucknow mrts project phase 1b
Lkgc 02 01 general consultancy services for lucknow mrts project phase 1b
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreDesign, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.
Design, supply, installation, testing and commissioning of interoperable signalling system for lajpat nagar - saket g-block corridor (line-11) of delhi metro phase-iv mrts.
Read moreShortlisting of general consultants for corridor-1 and 2 of phase-3 of bangalore metro rail project.
Shortlisting of general consultants for corridor-1 and 2 of phase-3 of bangalore metro rail project.
Read moreEngagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.
Read moreDc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.
Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.
Read moreContract package-p3- partial and full demolition/dismantling of buildings/structures identified from sumanahalli station (excl) to kempapura station (excl) (from ch. 17.695 km to ch. 30.866 km) in corridor-1of bangalore metro rail project phase-3.
Contract package-p3- partial and full demolition/dismantling of buildings/structures identified from sumanahalli station (excl) to kempapura station (excl) (from ch. 17.695 km to ch. 30.866 km) in corridor-1of bangalore metro rail project phase-3.
Read moreContract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.
Contract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.
Read moreof your Industry type