Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Manufacturing, Supply And Laying Of Rcc Cable Trough For Orr, Airport Line (New Line) Of Phase 2 A And Phase 2 B And Depot Entry Portion Of R 4 And R 2 Extensions.
|
| Description |
Manufacturing, Supply And Laying Of Rcc Cable Trough For Orr, Airport Line (New Line) Of Phase 2 A And Phase 2 B And Depot Entry Portion Of R 4 And R 2 Extensions.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Projects Division - E AND M-BMRCL |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 29500 |
| EMD | 15 Lakh |
| Tender Value | 10.96 Crore |
| Place | |
| Link | Login to view |
| Start Date | September 30, 2026 16:30 |
| End Date |
Open
30/10/2026
17 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Manufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Manufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Read moreIndependent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Independent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Read moreOutsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9 (phase i) including charkop and mandale depot for three years
Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9&#x0d (phase i) including charkop and mandale depot for three years
Read moreErection of 3 phase, 4 wire system lt power line for illumination in quarry 2b, 2a (part-b) and part (c) at s.b. project.
Erection of 3 phase, 4 wire system lt power line for illumination in quarry 2b, 2a (part-b) and part (c) at s.b. project.
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreProof checking for detailed structural design of metro and double decker viaducts of line 2a, 2b, 4, 4a and 4b of pune metro rail project, phase-2.
Proof checking for detailed structural design&#x0d of metro and double decker viaducts of line 2a, 2b, 4, 4a and 4b of&#x0d pune metro rail project, phase-2.
Read moreCivil and structural works including architectural finishes for travellator and connecting walkway between reach-5/phase-2/yellow line central silk board station to blue line orr central silk board station of bangalore metro rail project, phase-2a.
Civil and structural works including architectural finishes for travellator and connecting walkway between reach-5/phase-2/yellow line
 central silk board station to blue line orr central silk board station of bangalore metro rail project, phase-2a.
Read moreRate contract for general e and m works in phase 1 and phase 1 extension of cmrl corridor1 stations from chennai airport metro to wimco nagar depot station including metros, nandanam staff quarters and wimco nagar elevated depot
Rate contract for general e and m works in phase 1 and phase 1 extension of cmrl corridor1 stations from chennai airport metro to wimco nagar depot station including metros, nandanam staff quarters and wimco nagar elevated depot
Read moreRate contract for general e and m works in phase 1 and phase 1 extension of cmrl including stations from chennai airport metro to wimco nagar depot, chennai central to st. thomas mount, koyambedu admin building, koyambedu depot, metros
Rate contract for general e and m works in phase 1 and phase 1 extension of cmrl including stations from chennai airport metro to wimco nagar depot, chennai central to st. thomas mount, koyambedu admin building, koyambedu depot, metros
Read moreof your Industry type