Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Off Loading The Annual Maintenance Job Of Jwala Dragline Of Dudhichua Project For A Period Of 1 Year
|
| Description |
Off Loading The Annual Maintenance Job Of Jwala Dragline Of Dudhichua Project For A Period Of 1 Year
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_299947_1 |
|
Reference Number |
DCH/GM (Excv)/Tender /Dragline /2023-24/88 |
| Tender Fee | 0 |
| EMD | 97400 |
| Tender Value | - |
| Place | NCL, DUDHICHUA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310702 |
| Start Date | February 01, 2024 15:00 |
| End Date |
Expired
12/02/2024
Expired 973 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Read moreEngagement of job work contract for machine-made raw agarbathi blending/dilution, perfume dipping of cleaned raw agarbathies, and packing of various brands of agarbathi products and mysore sandal dhoop cones at sandalwood oil division, mysuru, for a period of one year.
Engagement of job work contract for machine-made raw agarbathi blending/dilution, perfume dipping of cleaned raw agarbathies, and packing of various brands of agarbathi products and mysore sandal dhoop cones at sandalwood oil division, mysuru, for a period of one year.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreOffloading work for denting and painting of 24 96 jwala dragline of dudhichua project
Offloading work for denting and painting of 24 96 jwala dragline of dudhichua project
Read moreOffloading the annual maintenance of 24 96 jwala dragline of dudhichua project for 1 year
Offloading the annual maintenance of 24 96 jwala dragline of dudhichua project for 1 year
Read moreOffloading work to outside agency towards repairing of hoist drum assy of 24 96 jwala dragline of dudhichua project
Offloading work to outside agency towards repairing of hoist drum assy of 24 96 jwala dragline of dudhichua project
Read moreOffloading the work for repairing of oval holes of drag and hoist gearboxes in 24 96 jwala dragline of dudhichua project
Offloading the work for repairing of oval holes of drag and hoist gearboxes in 24 96 jwala dragline of dudhichua project
Read moreOffloading the work for repairing of oval holes of drag and hoist gearboxes in 24 96 jwala dragline of dudhichua project
Offloading the work for repairing of oval holes of drag and hoist gearboxes in 24 96 jwala dragline of dudhichua project
Read moreof your Industry type