Tender Details

About Tender

🛢️ Procurement Opportunity: E100 Fuel Testing Equipment Upgrade 🛢️ Hindustan Petroleum Corporation Limited (Hpcl), A Leading Public Sector Undertaking, Is Seeking Bids For The Upgradation Of Fuel Testing Equipment To Accommodate E100 Fuel Testing. 🧪 📅 Submission Deadline: April 19, 2024, 3:00 Pm This Project Aims To Enhance The Testing Capabilities For The Latest Fuel Standards. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Pricing, And Implementation Timelines. Keywords: Upgradation, E100 Fuel Testing, Hindustan Petroleum Corporation Limited, Public Sector Undertaking, Fuel Testing Equipment, Tender, Bid, Bangalore
Particulars Details
Title
Upgradation Upto E100 Fuel Testing
Description
Upgradation Upto E100 Fuel Testing
Organisation Hindustan Petroleum Corporation Limited | Public Sector Undertakings
Tender Id 124935
Reference
Number
2400011579-HA-09550
Tender Fee 0
EMD 0
Tender Value
Place Bangalore
Link http://tenders.hpcl.co.in/tenders/tender_prog/Tenders_details.asp?id=124935
Start Date April 05, 2024 15:30
End Date

19/04/2024 ( Expired 435 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Read more
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.

Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.

Read more
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.

Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise