| Particulars | Details |
|---|---|
| Title |
Kothagudem Thermal Power Plant V Vi Stages
|
| Description |
Ktps V And Vi Stages As Valuation For The Units Of Ktps V And Vi Stages, Paloncha Independently And Unit Wise Required For Insuring The Plant Assets Under Iar Policy, In Compliance To The Irdai Guidelines
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 577902 |
|
Reference Number |
e-CEG/SEG-II/E2/A6/KTPS-VVI/Assets Valuation/ 39 /2024-25 |
| Tender Fee | 18 |
| EMD | 1 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | February 27, 2025 23:30 |
| End Date |
Expired
20/03/2025
Expired 556 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreKothagudem thermal power plant- v and vi stages
Tggenco-providing insurance coverage to the assets of unit-9, 10 and 11 of ktps-v and vi stages under industrial all risk policy and insurance coverage for standalone public liability and terrorism for entire plant of ktps-v and vi stages for a period of one year i.e., from 01.09.202400:00 hrs to 31.08.202524:00hrs.
Read moreKothagudem thermal power station v vi stages, paloncha
Ktps stage-v and vi- raising of additional ash pond bunds from ch: 0m to 3200m and suraram bund from ch:4400m to ch:5450m from el115.50m to el 120.50m including raising of wells and spillway at paloncha, bhadradri-kothagudem dist
Read moreKothagudem thermal power plant - vi stage
Supply of 2000kva, 1600kva, 630kva, 11kv/433 volts, dyn-11 dry type indoor transformers of unit-xi of ktps-vi stage
Read moreKothagudem thermal power station- stages-vvi
Tggenco - ktps v and vi stages - providing insurance coverage to the plant assets of (2x250mw) unit-ix, unit-x and (1x500mw) unit-xi of ktps-v and vi stages under industrial all risk (iar) policy and insurance coverage for standalone public liability and terrorism for entire plant of ktps v and vi stages for a period of one year i.e., from 01.09.2025 00:00 hrs to 31.08.2026 24:00 hrs.
Read moreKothagudem thermal power plant - v stage
Service charges towards deputation of engineer for testing, tuning and trouble shooting of unit 9 and 10 davrs and its pss in ktps v stage
Read moreKothagudem thermal power plant - vi stage (1x500 mw)
Supply, erection, testing and commissioning of 220v, 1820ah, plante type station load batteries set-i (106 cells) of ktps-vi stage along with acid, vent plugs, inter cell connectors, fasteners, terminal shrouds, insulated rubber coating teak wood stand with insulators under buy back of 106 cells of unit-xi of ktps-vi stage.
Read moreKtps-v vi stages
Engaging of 16/17ton lorry along with driver cleaner on hire basis for a mileage up to 12000km/year and usage time of 8hrs/day for official utilization of stores and services division/ktps-vvi stages for the year 2024-25 i.e., from actual date of utilization to dt:31.03.2025 with year of manufacturing on or after 2015.
Read moreKtps-v vi stages
Ktps vi stage bm deputation of service engineer for servicing of actuators of hp lp valves gates and dampers in unit xi boiler during the annual overhaul period for the fy 2025-26.
Read moreof your Industry type