Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Zone 3 Tajganj Room No. 39 Construction Work By Cc From Empire Tailors To Damodar House And Link Street In Namner Kutlupur.
|
Description |
Zone 3 Tajganj Room No. 39 Construction Work By Cc From Empire Tailors To Damodar House And Link Street In Namner Kutlupur.
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 60987 |
Tender Value | |
Place | AGRA |
Link |
AAAAAAAAAA Login to view |
Start Date | June 18, 2025 18:30 |
End Date |
25/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Construction of c.c. road from sudha kurmi to nema ji house and from gupta aunty to shishu mandir school in ward number 10.
Read moreZone-1 chhata room no. 43, from char puliya in foundry nagar to kk nagar road on the way to nagar, interlocking work on road and side track by hotmix.
Zone-1 chhata room no. 43, from char puliya in foundry nagar to kk nagar road on the way to nagar, interlocking work on road and side track by hotmix.
Read moreZone-1 chhata room no. 43, bhagwati bagh, from factory no. c-38 to water plant near jagdamba degree college and from theka desi sharab to jaharveer baba temple, road improvement work by hotmix.
Zone-1 chhata room no. 43, bhagwati bagh, from factory no. c-38 to water plant near jagdamba degree college and from theka desi sharab to jaharveer baba temple, road improvement work by hotmix.
Read moreDevelopment work in m and t workshop located at hariparvat zone, room no.-33, transport nagar.
Development work in m and t workshop located at hariparvat zone, room no.-33, transport nagar.
Read moreConstruction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41
Construction of pcc drain from ihsdp colony to mutuja khan house and various places at ward no.41
Read moreConstruction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Read moreConstruction of cc road from mohan kevat house to dr mukherjee house at ward no 12
Construction of cc road from mohan kevat house to dr mukherjee house at ward no 12
Read moreof your Industry type