Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Up Gradation For Yedshi Latur Road Section Of Stretch, Nh 63, Ing From Ch. 24 350 To Ch. 61 875 Km (Length 37.525 Km) To 4 Lps In The State Of Maharashtra On Epc Mode.
|
| Description |
Rehabilitation And Up Gradation For Yedshi Latur Road Section Of Stretch, Nh 63, Ing From Ch. 24 350 To Ch. 61 875 Km (Length 37.525 Km) To 4 Lps In The State Of Maharashtra On Epc Mode.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_829621_1 |
|
Reference Number |
RO/MUM/TENDER/2024-25/02 |
| Tender Fee | 0 |
| EMD | 4.52 Crore |
| Tender Value | - |
| Place | Yedshi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=871785 |
| Start Date | November 15, 2024 16:30 |
| End Date |
Expired
14/02/2025
Expired 610 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreHt line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Ht line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Read moreRehabilitation and upgradation arawail-kante section(ch.241.300 to 281.300) section of nh-6 in the state of maharashtra to 4lps under nhdp-iv.
Rehabilitation and upgradation arawail-kante section(ch.241.300 to 281.300) section of nh-6 in the state of maharashtra to 4lps under nhdp-iv.
Read moreWidening and strengthening of existing highway 2l ps (10m) in km 0.00 to 21.500 nh548 ckuslamb to nh 52 yedshi ) section of nh 63 barshi yedshi murud latur renapur udgir deglur sargoli in state of maharashtra. (total length-21.500 km) through epc
Widening and strengthening of existing highway 2l ps (10m) in km 0.00 to 21.500 nh548 ckuslamb to nh 52 yedshi ) section of nh 63 barshi yedshi murud latur renapur udgir deglur sargoli in state of maharashtra. (total length-21.500 km) through epc
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Read moreWidening and strengthening of existing highway 2l ps (10m)in km 0/00 to 21/500 ( nh 548 c kuslamb to nh 52 yedshi) section of nh 63 ie barshi - yedshi - murud - latur - renapur - udgir - deglur - sargoli ) in the state of maharashtra through (epc) co
Widening and strengthening of existing highway 2l ps (10m)in km 0/00 to 21/500 ( nh 548 c kuslamb to nh 52 yedshi) section of nh 63 ie barshi - yedshi - murud - latur - renapur - udgir - deglur - sargoli ) in the state of maharashtra through (epc) co
Read moreConsultancy services for authoritys engineer for supervision of rehabilitation and upgradation of nh 753b from nandurbar to taloda to 4lps in the states of maharashtra/gujarat on epc mode.
Consultancy services for authoritys engineer for supervision of rehabilitation and upgradation of nh 753b from nandurbar to taloda to 4lps in the states of maharashtra/gujarat on epc mode.
Read moreKiifb-hill highway-improvments to plachery-karikalmoozhi stretch(ch 0/000 to 7/350)inkottayam district.design of two minor bridgesat ch 4/450 and ch 7/070.-investigation works
Provisions included in the estimate&#x0d are conduct topographical survey, cross sectional&#x0d details ,&#x0d hydraulic velocity of thode and soil&#x0d investigation detais of 4 nos of boreholes ateach&#x0d sides bridges
Read moreConsultancy services for authoritys engineer for supervision of rehabilitation and upgradation to four lane with paved shoulder configuration from km 24-350 to km 61-875 (jawale - borgaon kale) of nh-63 in the state of maharashtra on epc mode.
Consultancy services for authoritys engineer for supervision of rehabilitation and upgradation to four lane with paved shoulder configuration from km 24-350 to km 61-875 (jawale - borgaon kale) of nh-63 in the state of maharashtra on epc mode.
Read moreKiifb-urgent rectification work-patch repairs to myladi - mooleppadam bridge road of hill highway stretch in malappuram district -ch 10/900 to 20/875-general civil work
Kiifb-urgent rectification work-patch repairs&#x0d to myladi - mooleppadam bridge road of hill&#x0d highway stretch in malappuram district -ch&#x0d 10/900 to 20/875-general civil work
Read moreof your Industry type