Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Access Road To Chandannagar Highway Sub Division Office Building Of Chandannagar Highway Sub Division Under Hooghly Highway Division No Ii, P.W.(Roads) Dte. In The District Of Hooghly In The Year 2025 2026
|
| Description |
Repairing Of Access Road To Chandannagar Highway Sub Division Office Building Of Chandannagar Highway Sub Division Under Hooghly Highway Division No Ii, P.W.(Roads) Dte. In The District Of Hooghly In The Year 2025 2026
|
| Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
| Tender Id | 2026_WBPWD_1018540_1 |
|
Reference Number |
WBPWD/AE/CHSD/eNIT-12/2025-26 |
| Tender Fee | 0 |
| EMD | 9005 |
| Tender Value | - |
| Place | Office of the ASST ENG CHANDANNAGAR HIGHWAY SD |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2502933 |
| Start Date | March 07, 2026 15:30 |
| End Date |
Expired
16/03/2026
Expired 215 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Additional repair, strengthening of access roads and approaches at mph
Additional repair, strengthening of access roads and approaches at mph,sg, miscellaneous areas of pvunl.
Read moreConstruction of 6l access controlled greenfield highway from ahilyanagar km 290.000 to hasapur km 512.000 (ahilyanagar bypass pkg 2)
Construction of 6l access controlled greenfield highway from ahilyanagar km 290.000 to hasapur km 512.000 (ahilyanagar bypass pkg 2)
Read moreRepairs construction of access roads at worli hill reservoir in g south ward
Repairs construction of access roads at worli hill reservoir in g south ward
Read moreConstruction of roads fromt02-ramnagar to gourhati via koyat tala under khanakul-i block block in the district of hooghly
Construction of roads fromt02-ramnagar to gourhati via koyat tala under khanakul-i block block in the district of hooghly
Read moreDevelop of 6l access controlled greenfield highway starting from junction with nh60 at adgaon km. 138.00 to ahilyanagar km. 290.000 (ahilyanagar bypass pkg i)
Develop of 6l access controlled greenfield highway starting from junction with nh60 at adgaon km. 138.00 to ahilyanagar km. 290.000 (ahilyanagar bypass pkg i)
Read moreConsultancy services for preparation of detailed project report for development of access-controlled highway/expressway from chandigarh-baddi-shimla in the state of himachal pradesh.
Consultancy services for preparation of detailed project report for development of access-controlled highway/expressway from chandigarh-baddi-shimla in the state of himachal pradesh.
Read moreRepairing maintenance of access roads and construction of concrete drain at fci godown at 110 bn crpf lethpora pulwama
Repairing maintenance of access roads and construction of concrete drain at fci godown at 110 bn crpf lethpora pulwama
Read morePmc services for dpr pre constr activities supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 5.00 km (zamindar gali tunnel) on h-z-m rd incl approaches on both sides (tentative length 11 km) under (p) beacon in ut of j k
Read moreElectrical installation works at mal sdh and quarter no. 21b of the assistant engineer, mal highway sub-division under pwd roads directorate.
Electrical installation works at mal sdh and quarter no. 21b of the assistant engineer, mal highway sub-division under pwd roads directorate.
Read morePmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Pmc services for dpr, pre-constr activities, supervision for constr of highway tunnel of tentative length 2.20 km (km 12.90-23.00 on mpd rd incl constr of approach rd to nhdl (ps) spcn (1) length of 2.6 km from south portal of tunnel at km 12.90
Read moreof your Industry type