Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying And Fitting Of Main Line Including Pipe Special Of Damage Portion Of Realignment Of Various Road Stretches Between Pandrass To Pashkum Through Epc Mode (Under Bro Deposit).
|
| Description |
Laying And Fitting Of Main Line Including Pipe Special Of Damage Portion Of Realignment Of Various Road Stretches Between Pandrass To Pashkum Through Epc Mode (Under Bro Deposit).
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2024_PWD_13154_1 |
|
Reference Number |
E-Tender 10 of PHE Division Kargil of 2024-25 |
| Tender Fee | 545 |
| EMD | 1.09 Lakh |
| Tender Value | - |
| Place | Pashkum to Drass |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=33092 |
| Start Date | June 24, 2024 18:35 |
| End Date |
Expired
03/07/2024
Expired 836 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
Construction of bypasses at sheikhpura and khaira along with 1 no. of realignment at sikandra to two lane with paved shoulders standard on n.h. 333a under epc mode in state of bihar (job no. nh-333a-2022-23-br-58).
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreOverlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor
Read moreOne time improvement of existing left over (bypassed) road stretches from km 354.531 to km 358.842 of kurnool - chittoor - ranipeta road of nh-40 (chittoor town limits) in state of andhra pradesh on epc mode under annual plan 2026-27
One time improvement of existing left over (bypassed) road stretches from km 354.531 to km 358.842 of kurnool - chittoor - ranipeta road of nh-40 (chittoor town limits) in state of andhra pradesh on epc mode under annual plan 2026-27
Read moreOne time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
One time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConsultancy services for ae for supervision of construction of realignment between pandrass_pashkyum (net length is 27.10 km) on road zozila_kargil_leh (nh_1) to 2 lane specifications under project vijayak (bro) in the ut of ladakh on epc mode
Consultancy services for ae for supervision of construction of realignment between pandrass_pashkyum (net length is 27.10 km) on road zozila_kargil_leh (nh_1) to 2 lane specifications under project vijayak (bro) in the ut of ladakh on epc mode
Read moreRealignment of pipe line coming under the alignment of road widening including construction of pre-salting tank cum infiltration gallery at l.c road bhimbat under project vijayak by 55 rcc (greef) (under bro deposit) 3rd portion.
Realignment of pipe line coming under the alignment of road widening including construction of pre-salting tank cum infiltration gallery at l.c road bhimbat under project vijayak by 55 rcc (greef) (under bro deposit) 3rd portion.
Read moreDeposit - urgent rectification of damage portion of compound wall at central prison at poojappura thiruvananthapuram - general civil work
Deposit - urgent rectification of damage portion of compound wall at central prison at poojappura thiruvananthapuram - general civil work
Read moreConstruction and widening of 2 lane with paved shoulders from design ch 0.000 to 51.000 on rkctc road under project beacon(bro) on epc mode.
Construction and widening of 2 lane with paved shoulders from existing ch 0.000 to 56.600 and design 
 ch from 0.000 to 51.000 (total length is 51 km) on rkctc nh(701) road project beacon in the ut of jk 
 border roads organization (bro) on epc mode.
Read moreof your Industry type