Tender Details
Particulars | Details |
---|---|
Title |
Extenstion Of Street Light Phase And Fixing Of Street Light Fittings In The Campus Of Veterinary Hospital, Sti, Rourkela
|
Description |
Electrical
|
Organisation | Government of Odisha |
Tender Id | 2023_RMC_90880_2 |
Reference Number |
MC/RMC/15/2023 |
Tender Fee | 2000 |
EMD | 2160 |
Tender Value | |
Place | Rourkela Municipal Corporation, Rourkela |
Link | https://tendersodisha.gov.in |
Start Date | July 20, 2023 00:25 |
End Date |
29/07/2023 ( Expired 664 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreFinishing works of tl 123 at barc, visakhapatnam
Finishing works of tl 123 and other miscellaneous works in barc main campus, atchutapuram near visakhapatnam, a.p.
Read moreIndependent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Read moreIndependent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode
Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode
Read moreRunning maintenance of uws scheme under gomati district tripura/ sh- mtc. of pvc, ci, di, and gi pipeline including extension and washing of pipeline, repairing of leakage, fitting fixing of sluice valves, tyton collars etc. in different water supply
Running maintenance of uws scheme under gomati district tripura/ sh- mtc. of pvc, ci, di, and gi pipeline including extension and washing of pipeline, repairing of leakage, fitting fixing of sluice valves, tyton collars etc. in different water supply
Read moreRunning maintenance of rws schemes under gomati district tripura/sh- extension and mtc. of pvc pipeline in/c. fitting fixing of pvc and gi specials, er, pumpetc. attached to existing small bore deep tube well within amarpur r.d block under d
Running maintenance of rws schemes under gomati district tripura/sh- extension and mtc. of pvc pipeline in/c. fitting fixing of pvc and gi specials, er, pumpetc. attached to existing small bore deep tube well within amarpur r.d block under d
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of 01 nos surveillance cum op shelter acp shelter g 2 at bop bholaganj in aor of 110 bn bsf under shq bsf jowai sh pvdg iei fans and service connection and off grid solar plant
Construction of 01 nos surveillance cum op shelter acp shelter g 2 at bop bholaganj in aor of 110 bn bsf under shq bsf jowai sh pvdg iei fans and service connection and off grid solar plant
Read moreProviding and fixing open gym equipment in seva nagar park, amarkantak park and tulsi bihar park of ward no. 14 file no. 21/25x13/1
Providing and fixing open gym equipment in seva nagar park, amarkantak park and tulsi bihar park of ward no. 14 file no. 21/25x13/1
Read moreof your Industry type